EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 16, 2025 at 7:00 PM

Updated January 17, 2025

Site work, renovation and addition to a mixed-use development in Greensboro, North Carolina. Completed plans call for the addition of a educational facility; library; for the renovation of a library; and for site work for a library.

As of January 16, 2025, public information indicates that the renovation portion of this project has started construction. Electrical Equipment (BP 26A) bid earlier 2024. A timeline for remaining construction has not been confirmed. Interested parties in this project or future Skanska projects are encouraged to visit: https://partners.skanska.com/usa/teams/DocuPro/SitePages/Prequal%20Inquiry%20Request.aspx/ From earlier solicitation: UNC Greensboro is seeking proposals from qualified Construction Manager at Risk firms for the project entitled, Jackson Library Addition and Renovation, technology-rich learning environment and intellectual community hub. The scope of the project will consist of a comprehensive, transformative renovation to the existing building along with a new addition. The renovation will include updating the existing mechanical, electrical, plumbing, life safety and audiovisual systems. The project also includes addressing ADA issues and an IT Core Distribution Facility. Located at the bustling hub that is the physical center of campus, the project is envisioned as a complex, phased construction of an occupied building. As such, implementation will require meticulous and proactive planning. The project will integrate high technology group studies, central convening spaces and increased capacity for use by individual students. It is envisioned as a nexus of student academic success and transformative research resources. *This project has been updated for historical data and reference purposes. The information has been provided as it was received and confirmed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Under Construction

Library

$81,000,000.00

Public - State/Provincial

Addition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
70
Bidding Soon
1,455
All Active Projects
544
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2022

December 30, 2024

img_map_placeholder

320 College Ave, Greensboro, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.