BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Morgan City, Louisiana. Completed plans call for the renovation of a educational facility.

Any bids received after the above mentioned time will be returned unopened. Electronic bids at website as allowed by Act 590 amended Title 38:2212 are acceptable. Bids shall be accepted only from contractors who are licensed under LA-R.S.37:2150-2163 for the classification of MECHANICAL. Complete Bid Documents for this project are available in electronic form. They may be obtained from website. Questions about this procedure shall be directed to the Designer at: adginc@adginc.org; PHONE (337) 234-5710 No bid may be withdrawn after the scheduled closing time for receipt of bids for thirty (30) days. The bid security of all bidders, except the three lowest, will be returned promptly after the canvas of bids. All contractors and/or subcontractors whose bid exceeds Fifty Thousand Dollars ($50,000.00) shall be licensed under R.S. 37:2151-2163 of Louisiana Law. The St. Mary Parish School Board reserves the right to waive any and all informalities in, or to reject any/or all bids. The work of the base bid involves the removal and replacement of the existing HVAC systems on approximately half of the 1 st floor at Morgan City High School. Areas include one (1) Classroom Wing and the Gym. Work will include the removal and replacement of lay in ceilings required for installation of new ductwork, piping, controls, etc. and associated Electrical work to accommodate new systems. Contractor shall remove existing systems and ceilings and dispose of according to national and local codes. The construction site will be available for demolition to begin on May 30, 2022 and shall be completed by July 29, 2022. Alternate #1 shall include the replacement of the existing natural gas generator in the boiler room. The construction site will be available for demolition upon receipt of Notice to Proceed and shall be completed as indicated in Instruction to Bidders. Alternate #2 shall include the replacement of the lighting and ceiling tile/grid in the BandRoom, Chorus Room, and the adjacent Corridor. The construction site will be available for demolition to begin on May 30, 2022 and shall be completed by July 29, 2022. Alternate #3 shall include the replacement of the lighting in Gym with new LED fixtures. The construction site will be available for demolition to begin on May 30, 2022 and shall be completed by July 29, 2022.

Award

Educational

$1,174,500.00

Public - City

Renovation

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
30
Bidding Soon
470
All Active Projects
194
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2022

May 30, 2022

img_map_placeholder

2400 Tiger Dr, Morgan City, LA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.