BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 1, 2022 at 7:00 PM

Updated January 26, 2024

Site work and paving for a bridge / tunnel in Camdenton, Missouri. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

**Second addenda released that changed the bid date from 2/10 to 2/15. Bid time remains the same.** The proposed work involves replacing the Willow Creek Road vehicular-bridge crossing at the South Fork of Linn Creek with a single-span bridge 24' in width and will utilize MODOT type II girders anticipated to be raised a foot. The current wall abutment will be removed and will be replaced with a spill-slope style bridge (2' rock blanket) with an end bent supported by piles. All equipment, material and workmanship must be in accordance with the plans, specifications, and contract documents on file with Camden County.

Post-Bid

Bridges / Tunnels

$330,000.00

Public - State/Provincial

Paving, Site Work

24

8

4

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
54
Bidding Soon
629
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2022

March 14, 2022

Project location map

Willow Creek Rd, Camdenton, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.