EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 7, 2022 at 7:00 PM

Updated October 1, 2024

Demolition, site work and asbestos abatement for a municipal facility in Clintonville, Wisconsin. Completed plans call for the demolition of a municipal facility; for site work for a municipal facility; and for asbestos abatement for a municipal facility.

The teleconference line will be open 15 minutes before bids are due. Bids will be opened after the bid deadline. No inperson attendance at the bid opening will be possible. In general, the project consists of demolishing the building with general site address of 19 South Main Street in Clintonville, Wisconsin. This includes demolition of asbestos and lead based paint containing material; demolishing a three-story building, with a footprint of approximately 9,000 square feet. Proper disposal of commingled asbestos and lead containing demolition debris, abatement of features to remain in place; and provide services for utility abandonment are required. The project site is owned by the City of Clintonville and funded in part by a grant from the Community Development Block Grant Program (CDBG). The Contract shall be subject to Section 66.0903 of the Wisconsin Statutes pertaining to municipal wage scales and Federal Davis-Bacon wage rates. Prequalification of Bidders will be required. A single prime bid will be received for the work. BID SECURITY Bids must be accompanied by bid security in the amount of 5% of the maximum bid amount. Bid and bid security may not be withdrawn for a period of 45 days after the Bid Deadline. Bid security will be retained if the Bidder is awarded the Work and fails to execute the Agreement and furnish 100% Performance and Payment Bonds. PROJECT FUNDING This project is funded in part by the U.S Dept. of Housing and Urban Development - Community Development Block Grant Program (CDBG). The project will be subject to requirements contained in applicable state and federal regulations, including the requirements for Section 3, Segregated Facilities, Section 109, Executive Order 11246. The Contract shall be subject to Wis. Stats. 66.0903 pertaining to Federal Davis-Bacon wage rates. QUALIFICATIONS Any interested contractors shall attend a mandatory pre-bid meeting, meet prequalification requirements outlined in the Instructions to Bidders, and be approved by Owner prior to submitting a bid. Bidders shall prequalify by submitting a Bidder's Proof of Responsibility to the Owner in accordance with Wis. Stat. 66.0901(2). Bidders shall prequalify by submitting a Bidder's Proof of Responsibility to the Engineer (email to CMuske@clintonvillewi.org and PeotterB@AyresAssociates.com) by January 20, 2022. Approval or denial of qualifications to bid will be provided to contact name provided in the Bidder's Proof of Responsibility by the end of business day January 25, 2022, prior to the Bid Deadline. RIGHTS RESERVED Owner reserves the right to reject any or all bids and to waive informalities in any bid. BIDDING QUESTIONS ANSWERED DATE AND TIME: January 20, 2022 12:00 p.m.

Bid Results

Municipal

$366,120.00

Public - City

Asbestos Abatement, Demolition, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Barriers and Enclosures, Temporary Fencing, Temporary Controls, Temporary Environmental Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Lead Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Roofing and Siding Panels, Siding
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, Air Outlets and Inlets
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
25
Bidding Soon
383
All Active Projects
187
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2022

March 7, 2022

img_map_placeholder

19 S Main St, Clintonville, WI


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

19 South Main Street Demolition

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.