BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2022 at 7:00 PM

Updated November 15, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Tacoma, Washington. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

For RFQ Engineering - 2022 Titlow Park North Hidden Beach Bridge Replacement The Metropolitan Park District of Tacoma (Metro Parks Tacoma) is soliciting Letters of Interest and Statements of Qualifications for A&E services to assist the District with the Planning and Design of a Titlow Park North Hidden Beach Bridge Replacement The method of contractor selection has not been determined at this time. As of January 21, 2022, the due date and time has been confirmed with the owner.

Conceptual

Bridges / Tunnels

$2,350,000.00

Public - City

Demolition, New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
81
Bidding Soon
1,116
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2023

Project location map

To Be Determined, Tacoma, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.