BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Peoria, Arizona. Contact the soliciting agency for additional information.

Project Name: Stadium Trail, 75th Ave to Skunk Creek Project (TRACS) Number: T032103D District: Central Route/MP: N/A Funding Source: CMAQ Construction Funding FY: 2023 Stadium Trail, 75th Ave to Skunk Creek (Phase 2) includes approximately 0.15 miles of multi-use path, a clear span pedestrian bridge of Skunk Creek near its confluence with the Arizona Canal Diversion Channel (ACDC), and an undercrossing of the existing 75th Avenue bridge to connect to the existing trail along the ACDC. The proposed trail will consist of a 12-foot wide concrete path with 2-foot and 4- foot wide shoulders with landscaping and lighting. Safety rail will be required in sections abutting Skunk Creek and ACDC. The consultant shall prepare preliminary and final construction documents, supporting documents and all clearances necessary to bid and award the project for construction. The services shall include but are not limited to: Project Management, Agency Coordination, Site Visits, Survey/Control/Base Map Preparation, Bridge and path design, Design exceptions, Structural Engineering Alternatives Analysis/Design, Evaluation of Feasibility for Undercrossing of Existing 75th Avenue Bridge and Connection to Existing ACDC Path, Preliminary Lighting Design, Wayfinding and Signage, Drainage Analysis and Drainage Design, Geotechnical/Materials Report, Utility Data Acquisition, Coordination and Relocation Design, Right of Way Identification and Acquisition Support, Environmental Analysis including Cultural Resources, Biological Assessment, Clean Water Act in Support of Obtaining a Categorical Exclusion for the Project, Support for Public Meetings, Preparation of Cost Estimates, Schedules, Construction Phasing, Landscaping and Landscape Irrigation, 404 and 408 Permitting Requirements, Coordination with Design Team for Stadium Trail Phase I, and Coordination with Private Development. Questions, in writing, shall be received by ECS at the below email address until 01/05/2022 at 2:00 P.M. (Arizona Time). No further questions shall be accepted after the time specified. The method of contractor selection has not been determined at this time. AZDOT - RFQ Statewide Environmental On-Call - Stadium Trail, 75th Ave to Skunk Creek

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
22
Bidding Soon
717
All Active Projects
289
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.