BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Needham, Massachusetts. Completed plans call for site work for a water / sewer project.

Water Treatment Plant Actuator Valve Replacements The Town of Needham (hereinafter referred to as the "Town"), acting through its Town Manager, invites highly qualified bidders to submit sealed bids to perform all labor necessary for Filter Drain Valve Actuators Replacement. It is anticipated that work will commence February 1st, 2022. It is anticipated that all work will be substantially complete by June 30th, 2022 and will be operational on or before July 1st, 2022. The Town of Needham is seeking a qualified vendor to remove (4) existing 4" filter drain valve actuators and to replace them with an updated version Model # SQ05.2 AUMA part-turn electric motor valve actuators at the Charles River Water Treatment Facility. The original drain valve actuators are 20 plus years old past its useful life expectancy. The existing wiring will be disconnected prior to removal and rewired up to the new equipment.

Post-Bid

Water / Sewer

$40,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings

Find More Local Projects

Within 75 Miles of This Project
315
Active Projects
166
Bidding Soon
2,981
All Active Projects
1,233
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 24, 2022

February 3, 2022

img_map_placeholder

Multiple Locations, Needham, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Filter Drain Valve Actuators Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.