BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Sioux City, Iowa. Conceptual plans call for paving for a sidewalk / parking lot; for site work for a sidewalk / parking lot; for the construction of a 75,760-square-foot pre-engineered storage facility; and pre-engineered storage facility.

62,280 SF Maintenance Building: The maintenance building will include maintenance bays, mechanic bays, wash bays, water reclamation, brine making and containment, as well as an office area. The core office area will provide offices and cubicles for 11-13 employees, a large conference room, a small conference room, a break room, restroom facilities, janitor closet, and the building's core functions: mechanical, electrical, and communication rooms. 13,480 SF cold storage building- 15 bay cold storage building Site work: Site work shall consist of final site grading, paving, site gravel, sidewalks, exterior fueling depot, utility improvement, hoop site preparation and exterior lighting. As per specifications and plans DOT Estimated Contract Start Date: March 1, 2022 DOT Substantial Completion Date: June 9, 2023 DOT Final Contract End Date: June 30, 2023 Project No. 07260.020 IADOT - New Sioux City Complex - Maintenance Garage and Cold storage Building. Mr. Steven Jastram, President and Principal Architect for Architecture Incorporated presented project information in an email on February 1, 2020, and October 8, 2020. The email on February 1, 2020, included an RFP from the IDOT that was titled, "District 3 Consolidated Design" and the IDOT Base Proposal Template. The email on October 8, 2020, included Sheet C.01 that was titled, "Overall Area" and "Subconsultant Scope and Budget". CTS understands that this portion of the project will consist of the office building portion of the site, which is located on the east side of Sioux City in Woodbury County, Iowa. The following is our understanding of the project. Question Cutoff Date 1/30/2022 11:00:00 PM (ET)

Project Abandoned

Warehouse / Distribution - Pre-Engineered Storage Building

$14,053,385.00

Public - State/Provincial

New Construction, Paving, Site Work

74

52

45

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
15
Bidding Soon
199
All Active Projects
103
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2022

March 1, 2022

img_map_placeholder

6405 Gordon Dr, Sioux City, IA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.