Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 10, 2022 at 7:00 PM
Updated January 26, 2024
Site work, paving and new construction of a mixed-use development in Sioux City, Iowa. Conceptual plans call for paving for a sidewalk / parking lot; for site work for a sidewalk / parking lot; for the construction of a 75,760-square-foot pre-engineered storage facility; and pre-engineered storage facility.
62,280 SF Maintenance Building: The maintenance building will include maintenance bays, mechanic bays, wash bays, water reclamation, brine making and containment, as well as an office area. The core office area will provide offices and cubicles for 11-13 employees, a large conference room, a small conference room, a break room, restroom facilities, janitor closet, and the building's core functions: mechanical, electrical, and communication rooms. 13,480 SF cold storage building- 15 bay cold storage building Site work: Site work shall consist of final site grading, paving, site gravel, sidewalks, exterior fueling depot, utility improvement, hoop site preparation and exterior lighting. As per specifications and plans DOT Estimated Contract Start Date: March 1, 2022 DOT Substantial Completion Date: June 9, 2023 DOT Final Contract End Date: June 30, 2023 Project No. 07260.020 IADOT - New Sioux City Complex - Maintenance Garage and Cold storage Building. Mr. Steven Jastram, President and Principal Architect for Architecture Incorporated presented project information in an email on February 1, 2020, and October 8, 2020. The email on February 1, 2020, included an RFP from the IDOT that was titled, "District 3 Consolidated Design" and the IDOT Base Proposal Template. The email on October 8, 2020, included Sheet C.01 that was titled, "Overall Area" and "Subconsultant Scope and Budget". CTS understands that this portion of the project will consist of the office building portion of the site, which is located on the east side of Sioux City in Woodbury County, Iowa. The following is our understanding of the project. Question Cutoff Date 1/30/2022 11:00:00 PM (ET)
Project Abandoned
Warehouse / Distribution - Pre-Engineered Storage Building
$14,053,385.00
Public - State/Provincial
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 8, 2022
March 1, 2022
6405 Gordon Dr, Sioux City, IA
Related To This Project
Sioux City, IA
Bid Date: Aug 13 2019
Sioux City, IA
Bid Date: Nov 09 2020
Sioux City, IA
Bid Date: Dec 01 2021
Sioux City, IA
Bid Date: Jul 28 2023
Sioux City, IA
Bid Date: Feb 28 2019
Sioux City, IA
Bid Date: Feb 27 2019
Sioux City, IA
Bid Date: May 28 2019
Sioux City, IA
Bid Date: Sep 01 2023
Sioux City, IA
Bid Date: Aug 15 2023
Sioux City, IA
Bid Date: Aug 02 2023
Sioux City, IA
Bid Date: Jul 31 2023
Sioux City, IA
Bid Date: Aug 02 2023
Sioux City, IA
Bid Date: Nov 14 2023
Sioux City, IA
Bid Date: Jul 06 2023
Sioux City, IA
Bid Date: Jul 18 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
