BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of an educational facility in Fort Worth, Texas. Completed plans call for the construction of a 120,000-square-foot educational facility; and for site work for a 15-acre educational facility.

Description: The new Westpark Relief Elementary School at Ventana, located on a 15.0-acre parcel in the new Ventana development in southwest Forth, is designed to serve Fort Worth ISD students from Pre-Kindergarten through the 5th grade. The new 120,000sf facility includes Central Administration spaces, the school's Cafeteria, Multi-Purpose Room, and Gymnasium along with lower grand and special education classrooms o the main entry level with addition upper grade classrooms and the school's Media Center on the lower level. The building infrastructure includes a convention steel structure supplemented with concrete building site retaining wall mitigating the sloping topography. Exterior building materials include stone veneer, concrete, metal panel accents and traditional architectural storefront and curtain wall systems. The mechanical design is also conventional supplemented with high efficiency roof top units along with traditional electrical and plumbing systems. The new facility includes a code compliant storm shelter with ICF construction and ICC-500 design elements. Construction is scheduled to be Type 1A. Construction is expected to begin spring of 2022 and be substantially complete in the summer and ready for the fall semester in August 2023. The project includes 3 Alternates as follows: 1) Provide integral colored concrete for site paving (ref. Landscape documents), 2) Provide raised planters (ref. Landscape documents), and 3) Standalone storage building. Please be sure to include proposals for the Alternates as applicable to your scope(s) of work. FWISD has a HUB participation expectation of at least 25% of the total dollar value of the contract. Addendum #1-#3 has been issued as of January 27, 2022.

Under Construction

Educational

$36,500,000.00

Public - City

New Construction, Site Work

425

36

43

4

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
71
Bidding Soon
3,527
All Active Projects
1,378
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2022

April 1, 2022

img_map_placeholder

To Be Determined, Fort Worth, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.