BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and new construction of a mixed-use development in Richmond, Texas. Completed plans call for the construction of a 19,205-square-foot educational facility; for site work for a educational facility; warehouse / distribution facility; and warehouse / distribution facility.

**As of January 28, 2022 the project has not been awarded yet.** Lamar CISD Argricultural Barn No 3 - Volume 3 - Location: 7228 Powerline Rd, Richmond, TX 77469 Lamar CISD Elementary School No 32 - Volume 2 - Location: Richmond, TX 77469 The Project consists of the construction of Elementary School No. 32 & Ag Barn No. 3 for Lamar Consolidated Independent School District, Richmond, Texas, as shown on the Drawings and described in the Specifications. The work will be performed under a single lump-sum contract. Belled Drilled piers, per linear foot, including drilling, reinforcing and concrete. Provide chillers Project No- 21-024.00, 215-2021-00768-00 Value Elementary School No. 32: $26,000,000 Ag Barn No. 3: $3,110,000 Copies of the Plans and Specifications maybe picked up at Thomas Printworks for $500.00 for One (1) complete set. Please call the number below to verify when the set is available. Thomas Printworks 4235 Richmond Ave. Houston, Texas 77027 713-621-0022 Contact: Susie Sandoval The Owner reserves the right to reject any and all proposals and to waive any irregularities in the Competitive Sealed Proposal process. No proposal shall be withdrawn within 45 days after the proposal opening without the specific consent of the Owner A Proposal Bond from a bonding company acceptable to the Owner or a certified check in an amount equal to 10 percent (10%) of the greatest amount of proposal must accompany each offeror's proposal. : A Payment Bond and Performance Bond, each in an amount equal to 100 percent (100%) of the Contract Sum conditioned upon the faithful performance of the Contract will be required. Please note that all bonding companies presented must be acceptable to the Owner. Undersigned agrees to begin Work upon receipt of Notice of Award anticipated to be February 16, 2023. Elementary School 32 shall be Substantially Complete by April 17, 2023 and Ag barn No. 3 shall be Substantially Complete by September 16, 2022. RFI's DUE: 01/14/2022 9:00 AM CST

Post-Bid

Warehouse / Distribution

$29,110,000.00

Public - City

New Construction, Site Work

294

52

131

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
76
Bidding Soon
2,716
All Active Projects
964
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2022

February 16, 2022

img_map_placeholder

Multiple Locations, Richmond, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.