Published April 15, 2023 at 8:00 PM

Updated October 1, 2024

Site work, paving and renovation of a mixed-use development in Springfield, Illinois. Completed plans call for the renovation of a water / sewer project; for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The work includes, but is not limited to, modifications to existing diversion structures and the existing Excess Flow clarifier, construction of a new flow control structure, the construction of a new swirl concentrator, construction of new duplex pump stations, and the corresponding piping, electrical, and sitework necessary to complete the work. The work shall also include but not be limited to excavation, bedding, haunching, backfilling, compacting, paving, surface restoration, and erosion/sedimentation control. Alternate 1: CSO Headworks Building Improvements Alternate 2: Demo Existing Clarifiers Alternate 3: Excess Flow Clarifier Bridges Alternate 4: Rehabilitation of 60" Excess Flow Clarifier Pipe Alternate 5: Excess Flow Clarifier Grout Alternate 6: Remove & Replace Excess Flow Clarifier Drain Alternate 7: Remove & Replace Excess Flow Clarifier Drain Pump Station Bid Security shall be made payable to OWNER, in an amount of ten percent (10%) of the Bidder's maximum Base Bid price and in the form of a certified or bank cashier's check or a Bid Bond issued by a surety meeting the requirements of Article 6.01 of the General Conditions and executed on the form included as Document 00 43 13 - Bid Bond As required by the award conditions of USEPA's Assistance Agreement with IEPA, all sub-agreements of the prime contractor must identify that the fair share percentages are 5% for MBEs and 12 % for WBEs. Owner reserves the right to reject any of the following: 1. Any Bid submitted after the date and time specified in the Advertisement for Bids. 2. Any Bid determined by Owner to be not a Responsible Bid. 3. Any Bid determined by Owner to be not a Responsive Bid. 4. Any Bid determined by Owner to be a conditional or qualified Bid. 5. All Bids. B. Discrepancies between words and figures will be resolved in favor of words. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. C. In evaluating Bids, OWNER shall consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and alternates and unit prices if requested in the Bid forms. It is OWNER's intent to accept alternates listed on the Bid Form (if any are accepted) in any order or combination. D. OWNER may consider the qualifications and experience of Subcontractors and other persons and organizations (including those who are to furnish the principal items of material or equipment) proposed for those portions of the Work as to which the identity of Subcontractors and other persons and organizations must be submitted as provided in the Supplementary Conditions or Specifications. Operating costs, maintenance considerations, performance data and guarantees of materials and equipment may also be considered by OWNER. E. OWNER may conduct such investigations as he deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of the Bidders, proposed Subcontractors and other persons and organizations to do the Work in accordance with the Contract Documents to OWNER's satisfaction within the prescribed time. F. OWNER reserves the right to reject the Bid of any Bidder who does not pass any such evaluation to OWNER's satisfaction. G. If the Contract is to be awarded, it will be awarded to the low, responsive, responsible Bidder, based on the Total Lump Sum Base Bid price. Contract will be awarded after the Bid evaluation has been submitted to the Agency and Owner has received written notice of Agency approval of the award. H. If the Contract is to be awarded, OWNER will give the Successful Bidder a Notice of Award as identified in Document 00 41 00, Section 1.02. I. All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the Project shall apply to the Contract throughout including the Act regulating wages in Illinois (Ill. Rev. Stat. Ch. 48, Sects 39s-1-12) and the Illinois Preference Act (Ill. Rev. Stat. Ch. 48, Sects 2201-2207). J. Should there be reasons why the Contract cannot be awarded within the specified period, the time may be extended by mutual agreement between Owner and the Bidder . 1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete Production Facilities." 2. Engineer reserves the right to reject Manufacturer at any time and to require Contractor to obtain different supplier. Engineer reserves the right to reject Manufacturer at any time and to require Contractor to obtain different supplier. Bidder accepts the provisions of the Agreement and Supplementary Conditions as to liquidated damages. BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work on time. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not substantially complete within the time specified in paragraph 3.1 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by OWNER if the Work is not substantially complete on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER an amount as set forth in SUPPLEMENTARY CONDITIONS for each day that expires after the time specified in paragraph 3.1 for substantial completion until the Work is substantially complete . Electronic copies of the Bidding Documents may be obtained from the issuing office Monday through Friday between the hours of 8:00 a.m. and 5:00 p.m. (local time). Electronic copies of documents may be obtained free of charge. Bid security shall be furnished in accordance with the Instructions to Bidders. MBE (4%), WBE (6.9%) All questions on the plans and specifications should be directed to CMT in writing by emailing them to me at sremmert@cmtengr.com. Questions received less than 7 days prior to the bid opening will not be answered as to give sufficient time to address items by addendum, if required. Question Deadline 04/05/2023

Bid Results

Water / Sewer

$8,160,000.00

Public - County

Paving, Renovation, Site Work

777

30

2

4

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Protecting Installed Construction, Closeout Submittals, Bonds, Project Record Documents, Demonstration and Training, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Membrane Roofing, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Tiling, Ceilings, Painting and Coating, Painting, High-Performance Coatings
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Furniture, Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Sanitary Sewerage, Facility Storm Drainage, Roof Drains, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Network Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Raceway and Boxes for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Soil Stabilization, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Caissons, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Ground Covers, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
45
Bidding Soon
687
All Active Projects
340
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2023

June 12, 2023

img_map_placeholder

3300 Mechanicsburg Rd, Springfield, IL

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Sugar Creek WWTP CSO Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.