BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2022 at 7:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Baldwin, Wisconsin. Contact the soliciting agency for additional information.

The proposal shall be quoted on a per ton basis with the quoted price including the total costs for all manpower and equipment needed. Proposers wishing to meet on site with St. Croix County Highway Department personnel prior to submitting a proposal should contact Greg Haig, County Highway Engineer at 715-760-1912. The proposal shall be for crushing and stockpiling Limerock at the Highway Department's Spooner Pit location, rural Woodville, WI, for a total estimated 60,000 tons of material as follows: Approximately 40,000 tons of dense 3/4 " base type, approximately 12,000 tons of dense 1 1/4 " base type material and 5,000 tons of Select Crushed Materials/rejected fines. In addition to this, the Department has approximately 3,500 tons of blacktop at the location that should be included in the total of material to be crushed and stockpiled. Crushing is to begin on a date agreed upon by both parties with all crushing to be completed prior to June 1, 2022. Please provide a tentative start date. Also, please refer to the enclosed location map and aerial shot rock location map. All Limerock shall meet current Wisconsin Department of Transportation specifications for dense 3/4" basetype material and dense 1 1/4" base-type material. The proposal shall include daily testing of all the material produced by the contractor to ensure that proper and uniform gradation is maintained throughout the operation with daily sieve tests for 3/4" base-type material and 1 1/4" base-type material. Test should include percentage of fracture. All test results shall be supplied to the County in a timely manner. In addition, the County will have access at all times to the sampling of the material for its own testing and the contractor shall coordinate their test results with the County's test results. The proposal shall be quoted on a per ton basis with the quoted price including the total costs for all manpower and equipment needed. No material production shall begin until the stockpile areas and methods have been reviewed and approved by the St. Croix County Highway Department. Please reference the enclosed site location maps. Proposers wishing to meet on site with the Highway Department personnel prior to submitting a proposal should contact Greg Haig, Highway Engineer, at 715-760-1912. Proposals shall be guaranteed for a period of thirty (30) days after date of opening. St. Croix County reserves the right to waive any irregularities, to reject any or all proposals, and to accept such proposal or proposals or various options of such proposal or proposals which, in its opinion, is the most advantageous to St. Croix County

Post-Bid

Roads / Highways

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
270
Active Projects
137
Bidding Soon
1,460
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2022

February 28, 2022

Project location map

Multiple Locations, Baldwin, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.