BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Belmont, North Carolina. Completed plans call for the renovation of a residential development; and for site work for a water / sewer project.

Scope of work will consist of renovations and modernization of existing project and includes, but is not limited to, the following items: Overview o Replace under slab and above slab cast iron pipe and galvanized steel pipe with new Schedule 40 PVC pipe and all related work shown on plans, in project manual, as required by codes and leave the unit it a condition that is move in ready; typical all Apartments and Administrative and Community Building. Residents will be relocated two buildings at a time, see preliminary re-location schedule. o Provide GFIC Devices as shown on the plans at all apartments and at Administrative and Community Building. Electrician will be permitted to proceed continuously ahead of the sewer work except may need to happen at the same time in the handicap accessible apartments. o Provide a unit price to provide a new dryer outlet where one is not presently in place (estimated at 26 apartments); provide new dryer duct/vent in the exterior wall at approximately 26 apartments as part of the unit price. o Convert one apartment to be a Hearing and Visual Impaired apartment, not limited to but including doorbell with strobes and a smoke detector / carbon monoxide detector system complete with strobes and inverter backup system. Replace light fixtures as noted. o Provide renovations to three Handicap apartments as shown on the plans. o Provide renovations to the Administrative and Community Building. Work to include convert one bathroom to be a handicap accessible bath and convert one bath to be a storage room. o Paint the full interior of each apartment. o The owner is requiring a Project Superintendent to be on site while work is going on. o Warranty - the owner is willing to stagger warranty dates due to the duration of the work. One group for Phase 1 Warranty will begin after Phases 1 thru 5 are 100% completed and accepted; the second group will begin after Phases 6 thru 10 are 100% and completed and the third Phase will begin after all work is completed and accepted. o As-Built Drawings Required: Contractor shall submit a clean set of prints red-lining any changes to the Plans. The As-Builts shall clearly show the areas of Asbestos Abatement, with dimensions. The As-Builts shall clearly show exact route of replacement sewer lines. Submit one electronic copy and one hard copy. o Provide all work as shown on Plans, in Project Manual, as required by codes and the authority having jurisdiction. Questions that arise from the Site Visits are to be directed to the Architect at bids@stognerarchitecture.com.

Post-Bid

Residential Subdivision

$300,000.00

Public - City

Renovation, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
117
Bidding Soon
1,852
All Active Projects
770
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 3, 2022

March 7, 2022

June 2, 2023

img_map_placeholder

51 Flowers Ct, Belmont, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.