BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a retail development in Half Moon Bay, California. Conceptual plans call for the demolition of a retail development; for the construction of a retail development; and for site work for a retail development.

San Mateo County Harbor District Pillar Point Harbor Retail Center Replacement Architectural Design, Engineering, Permitting and Construction Support Services The San Mateo County Harbor District ("District") is requesting proposals from qualified design and engineering firms or individuals (Proposer) to provide professional design, engineering, technical specifications, permitting and construction support services for replacement of the existing Retail Center (Tennant Row). This could include replacement of the existing structure, or the building of a new Retail Center at Pillar Point Harbor in a different location The District hereby notifies all Proposers that it is the policy of the District to ensure nondiscrimination on the basis of race, color, national origin or sex in the award and administration of contracts. Proposals will be examined by District Staff and reported to the San Mateo County Harbor District Board of Harbor Commissioners within one hundred twenty (120) calendar days after the proposals have been opened. The District reserves the right to reject any and all proposals; or to waive any irregularities or informalities in any proposal or in the proposal procedure; or to postpone the proposal opening for good cause. No Proposer may withdraw its proposal for a period of one hundred twenty (120) calendar days after the date of opening of the proposals. Each Proposer will be notified of award of contract, if an awardis made Ultimately, it is the responsibility of the Proposer to check the District's website for any Addenda that may be issued relative to this RFP January 31, 2022 @ 4:30 p.m. - Written Questions and Requests for Modifications or Clarifications are due February 7, 2022 - Response to Questions and Requests for Modifications or Clarifications Week of February 22, 2022(Tentative) - Proposer Interviews, if held The method of contractor selection has not been determined at this time. As of January 14, 2022, the due date and time has been confirmed with the owner.

Conceptual

Retail

$3,500,000.00

Public - County

Demolition, New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
42
Bidding Soon
1,538
All Active Projects
674
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2023

img_map_placeholder

1 Johnson Pier, Half Moon Bay, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.