EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 2, 2022 at 8:00 PM

Updated September 14, 2023

Demolition, site work and addition to a fire / police facility in Plano, Texas. Completed plans call for the addition of a 766-square-foot fire / police facility; for the demolition of a fire / police facility; and for site work for a fire / police facility.

The City of Plano is soliciting bids for EOC PSC Dispatch Expansion. Expansion of EOC PSC Emergency Dispatch into existing conference room. Project includes, but not limited to, demolition, modification of raised access floor, fabric sound panels, tape, bed & paint, carpet patch, electrical, HVAC. Questions must be submitted electronically through electronically. No questions will be answered over the phone or through email. Time Critical Bid/Proposal Deliveries: The City of Plano cannot guarantee, due to internal procedures, that any bids/proposals sent via US mail will be picked up and delivered by the closing date and time. It is recommended that critical bid/proposal deliveries be made either electronically through electronically or in person as described above. It is further recommended that users review all electronic response attachments to ensure the uploaded files are able to be downloaded and viewed. Instructions for this, if needed, can be found in the Supplier Bid Response Quick Tutorial online or by calling Support at 866-277-2645. Responses or parts of a response whether hardcopy or electronic that cannot be viewed may deem your submittal as non-responsive. In addition, the City reserves the right to request clarification in such cases. Bid Bonds may be submitted by uploading a scanned copy into Ionwave. The apparent low bidder will be required to furnish the original bid bond within 24 hours of the request by the Purchasing Department. 4/18/2022 05:00:00 PM (CT) Substitution Deadline Substitution requests must be submitted by this deadline and are encouraged to be submitted as early as possible. Bidders submitting substitution requests should pay careful attention to the documents/data needed for review on the substitution request form (product description, specifications, drawings, photographs and performance and test data adequate for evaluation of the request; applicable portions of the data are clearly identified). *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. This project has 120 working days allowed for TOTAL completion, Monday-Friday, 8:00 AM -5:00 PM.

Post-Bid

Fire / Police

$110,000.00

Public - City

Addition, Demolition, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Warranties, Project Record Documents, Commissioning
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 09 - Finishes

Division 09 - Finishes

Finishes, Tiling, Wall Finishes, Special Wall Surfacing, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Low-Voltage Distribution Equipment, Wiring Devices
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
74
Bidding Soon
3,524
All Active Projects
1,429
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

EOC PSC Dispatch Expansion Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.