BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Graham, Washington. Completed plans call for the addition of a 52,000-square-foot educational facility.

The GKHS Addition and renovation includes the addition of a new weight room & auxiliary gym, a new career center and a new 2-story classroom wing. The project is Type IIB construction and consists of roughly 52,000 SF of addition and renovation. **Please note this project is being delivered utilizing the the GC/CM procurement method. Bidders will be required to submit sealed bids by the date & time specified, utilizing the bid form provided in the bidding documents. Bids are required to be inclusive of all bid specifics stated in the bid package scope specifics. All bids over $300,000 will require a bid bond in the amount of 5% of the bid** *Value reflects overall project. Individual bid package budgets are not available at this time. This project involves the construction of additions and remodel work to expand an existing high school and related sitework. Construction Type II-B with complete electrical and mechanical systems. Existing and new buildings to be fully spinklered. Miscellaneous site and utilities improvements along with landscaping and irrigation are included as well. Location- 22100 108th Ave E Graham, WA 98338 *Addendum 04 Addendum 04 has been posted. Please note Addendums 01-03 have been posted for reference as well, but only pertain to the GK-01 & GK-02 Bid Packages. Addendums 01-03 DO NOT need to be acknowledged on the bid form for the GK-03 - GK-18 bid packages. All other addendums need to be acknowledged. This has been clarified in Addendum 04. *Bid Dates Postponed Addendum 05 was just received from the designers. The owner has requested that this addendum be incorporated into bidder pricing. Bid dates for bid packages GK-03 through GK-18 will be postponed in order to accommodate review of addendum 05. Revised bid dates & times will be finalized in Addendum 05. *Addendum 05 Addendum 05 has been posted. Please note Bid packages packages originally scheduled to bid 1/25 will now bid 2/1 (GK-03 - GK-08). Bid packages packages originally scheduled to bid 1/27 will now bid 2/3 (GK-09 - GK-12). Bid packages packages originally scheduled to bid 2/1 will now bid 2/4 (GK-13 - GK-18). *Addendum 06 Addendum 06 has been posted, with designer responses to the remaining bidder questions. Please note all bid dates and times remain the same. (See Addendum 05 for bid dates & times)

Under Construction

Educational

$26,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
27
Bidding Soon
667
All Active Projects
280
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2022

April 4, 2022

img_map_placeholder

22100 108th Ave E, Graham, WA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.