EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 29, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Erie, Pennsylvania. Completed plans call for site work for a water / sewer project.

As of March 29, 2022, project was awarded to Chivers Construction Company, Inc., awarded amount is $5,308,934.50. The work included under this contract covers the furnishing of all labor, materials, tools, and equipment required to complete the work as described herein, shown on the Contract Drawings and necessary for complete operating facilities. The work under Contract No. 2021-03A, 2021-03B, and 2021-03C generally consists of the replacement and/or abandonment of approximately 1,300 total water main service connections within the City of Erie. CLARIFICATION DEADLINE - 2/4/2022 4:00 PM No Bid may be withdrawn for a period of one hundred twenty (120) days after the time of the opening of the bids. Prior to contract award, contractor shall submit an E-Verify Program Verification in compliance with the Public Works Employment Verification Act 127 of 2012. A certified check payable to the Erie Water Works or a bid bond on the bid form executed by the Bidder and a surety company approved by the OWNER, in an amount equal to ten percent (10%) of the total amount of bid, must be submitted with each bid or bids will be considered nonresponsive and immediately rejected. SUCCESSFUL BIDDING BIDDER awarded this contract shall provide a performance surety in the amount of one hundred percent (100%) of the Contract amount. The Erie Water Works fully complies with the provisions of this act. All qualified bidders are invited to submit a proposal. EWW has established a 10% minority participation goal for all Prime Contractors bidding on the project, and any associated subcontractors hired by the prime contractors in order to complete the project. The goal relates to all construction related employees/trades to be employed on the project. Prime Contractors are required to provide a quarterly summary of minority participation in a format agreed to by EWW after the construction contracts are executed. Materials utilized must comply with the American Iron and Steel Act and the Steel Products Procurement Act. This project is funded in whole or in part with federal funds. Davis Bacon wage rates and other federal requirements apply and are included in the bid documents. Attention is called to the fact that PennVest funding is being provided for this project and that the requirements of PennVest, that not less than the minimum salaries and wages, as established by the Federal Davis-Bacon Wage rates must be paid on this project, and the CONTRACTOR must ensure that employees and applicants for employment are not discriminated against because of their race, creed, color, or national origin. 2021-03A - $1,750,000 2021-03B - $1,650,000 2021-03C - $1,622,000

Award

Water / Sewer

$5,308,934.00

Public - County

Site Work

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
89
Bidding Soon
1,173
All Active Projects
513
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2022

December 1, 2022

img_map_placeholder

Multiple Locations, Erie, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Multi-Contract, Service Connection Replacement Project Contract

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.