BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Salt Lake City, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

As of September 7, 2022, the project has not been awarded. A timeline for award has not been confirmed. Commodity Code Description 72140 Construction services including sewer maintenance and repair, roads and highways and excavation and backfill services, levee and dam construction and digging, ditching, road grading, rock stabilization, equipment rental or lease, and energy conservation 40170 - Pipe piping and pipe fittings including adapters and angle face rings and backup flanges and baffles and bends and bushings and caps and connectors 83100 - Utilities including gas and power and water and sewer and electricity and utilities management and consulting services, and alternative forms of energy, solar panels and servicing Question Submission Close Date 2/8/2022 2:00 PM MST Bidders are invited to bid on the Construction Contract named and numbered as: FY 19/20 WATER MAIN REPLACEMENTS 200 S - 600 W to Jeremy Street, Project No. 513505156 1000 North - 1500 West to Redwood Road, Project No. 513505216 Small Diameter Pipe Replacement Program, (Brookshire Drive) Project No. 513505314 700 East - Spring View to Scott Ave, Project No. 513505373 The project consists of four sites that will have water mains replaced. Site 1 installs approximately 2000 linear feet of 12-inch PVC waterline along 200 South from approximately 600 West to 850 West (Jeremy St.) that will replace the two existing mains. All service connections to be reconnected. Site 2 installs approximately 1600 linear feet of 12-inch PVC waterline to replace one of the two existing mains within the 1000 North roadway from Redwood Rd. to 1500 West. Site 3 installs approximately 1800 linear feet of 8-inch DI waterline to replace the single main that runs around Brookshire Dr and Millstream Ln, all services to be reconnected. Site 4 installs approximately 1800 linear feet of 12-inch DI waterline along 700 East, from Scott Ave to Springview Dr. with all services to be reconnected. Engineer's Estimate: $2,822,742.00 *Silver Spur Construction requests bids be submitted to: tysen@silverspurconst.com no later than February 9, 2022.

Bid Results

Roads / Highways

$3,668,411.00

Public - City

Paving, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
31
Bidding Soon
551
All Active Projects
256
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2022

April 12, 2022

img_map_placeholder

Multiple Locations, Salt Lake City, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.