BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a water / sewer project in Conroe, Texas. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

he work includes but is not limited to the demolition of the existing control building which includes, but is not limited to the demolition of existing motor control center, autosensory panel, aboveground conduit, wire, controls and all else as shown on the construction drawings; field verify and tag all existing conduits and wires, complete as specified; construction of new control building which includes, but is not limited to new CMU block building, complete with a roof, doors with panic hardware openings for the air conditioning units, and all other accessories as shown on the construction drawings and detailed in the specifications for a fully functioning facility, complete as specified; installation of a Motor Control Center (provided by the owner), which includes but is not limited to the labor, coordination with EATON, additional conduits, wires, controls and all else as shown on the construction drawings and detailed in the specifications for a fully functioning facility, complete as specified; procurement and installation all other electrical and mechanical equipment which includes but is not limited to Autosensory Panel, pressure transmitters, low voltage transformer, lighting panel, air conditioning unit, building lighting and outlets, chemical room exhaust fan, grounding system, conduit, wire, controls and all else as shown on the construction drawings and detailed in the specifications for a fully functioning facility, complete as specified; blasting and re-coating Booster Pump No. 4, including motor, discharge head, booster pump can, suction piping, and gate valve; relocation of the chemical tank as indicated in the drawings, which includes but not limited to route associated chemical lines and chemical pump.

Post-Bid

Water / Sewer

$460,000.00

Public - County

Demolition, New Construction, Site Work

21

23

9

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
61
Bidding Soon
2,718
All Active Projects
1,056
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2022

March 3, 2022

img_map_placeholder

To Be Determined, Conroe, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.