Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Caro, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The Contractor has examined the proposal, permits, plans, and the location of the work described here in and is fully informed as to the nature of the work and the conditions relating to its performance. Construction activity of clearing of the right of way, earth excavation, embankment, drainage improvements, pathway construction, HMA Paving, concrete curb and gutter, guardrail, signing, pavement markings and all other necessary work items shall remain in the road right of way. The quantities on the plan sheets are estimated quantities and differing quantities will need to be discussed with the engineer before work begins. The Contractor hereby proposes to furnish all necessary labor, equipment and materials to complete the work called out and shown on the plan sheets, for the lump sum price listed, herein described in strict accordance with the requirements of the Michigan Department of Transportation 2012 Standard Specifications for Construction, and/or such other special provisions and supplemental specifications as may be listed or attached to this proposal. The Contractor may not begin work on the project until the EGLE Permit is obtained by the Tuscola County Road Commission. It is anticipated the permit will be received by May 15th, 2022. Completion is scheduled for September 1st, 2022, unless arranged with Engineer. Liquidated damages may be assessed at a rate of $100.00 per day, starting September 1st, 2022. Contractor MUST coordinate during construction with the Tuscola County Road Commission Bank Stabilization Project. The Contractor is responsible for coordinating all utility relocations as needed. Attached is a list of the contact information for the utilities on site. Note: Miss Dig must be contacted 72 hours prior to start of work.
Award
Roads / Highways
$337,254.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 20, 2022
May 15, 2022
Bray Road, Caro, MI
Related To This Project
Caro, MI
Bid Date: Feb 03 2022
Caro, MI
Bid Date: Feb 03 2022
Caro, MI
Bid Date: Feb 03 2022
Caro, MI
Bid Date: Jan 17 2022
Caro, MI
Bid Date: Mar 31 2022
Caro, MI
Bid Date: Mar 16 2022
Caro, MI
Bid Date: Mar 24 2022
Caro, MI
Bid Date: Feb 22 2021
Caro, MI
Bid Date: Mar 11 2022
Caro, MI
Bid Date: Mar 17 2022
Caro, MI
Bid Date: Mar 17 2022
Caro, MI
Bid Date: Mar 11 2022
Caro, MI
Bid Date: Mar 03 2022
Caro, MI
Bid Date: Mar 03 2022
Caro, MI
Bid Date: Mar 03 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.