BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 2, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of an educational facility in Hartford, Connecticut. Completed plans call for the renovation of a 242,000-square-foot educational facility.

This project is for Location Group 3 at Hartford Law Campus consisting of 5 buildings totaling 242,000 square feet saving over 554,000 kWh annually with the Attorney General Office alternative adding 30,000 square feet saving 32,365 kWh annually. The scope of this project includes, but is not necessarily limited to, the retrofit or replacement of light fixtures and controls at the following university buildings Q&A (RFI) Due Date and Time March 18, 2022 2:00 PM The construction is planned to start: May 23, 2022 Construction duration: Four Months

Award

Educational

$454,032.00

Public - State/Provincial

Renovation

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
890
Active Projects
388
Bidding Soon
7,042
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2022

May 23, 2022

Project location map

39 Elizabeth St, Hartford, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.