BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Houston, Texas. Completed plans call for the renovation of a transportation facility.

Contract Award Date: May 24, 2022 Contract Award Number: 697DCK-22-C-00182 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: VNPDQR925EH3 Contractor Awarded Name: Sergent's Mechanical Systems, Inc. Contractor Awarded Address: Santa Paula, CA 93060-9653 USA Base and All Options Value (Total Contract Value): $2986734.69 JCN: 1201941, 1700529, 1700531, 1700604, 1701863, 1701943 The Federal Aviation Administration (FAA) is seeking qualified and capable contractors to submit offers for a Air Handler Unit (AHU) project at FAA's Air Route Traffic Control Center (ARTCC) located in Houston, Texas. This procurement is open to ALL-sized businesses. The NAICS code for this project is 238220 - Plumbing, Heating, and Air-Conditioning Contractors, which has a small business size standard of $16.5 Million. Estimated size of this project: Between $1,000,000 and $2,000,000. Work included in project: Phase 1: Demolish AHU 207 and provide and install new AHU and all associated work. Phase 2: Demolish AHU 206 and 208. Provide and install new units and complete all associated work. Only one unit will be removed from service at a time. Phase 3: Refurbish AHU 201, 202, 203, and 204, and complete all associated work. Only one unit will be removed from service at a time. Phase 4: Demolish AHU 209 and provide and install new AHU and all associated work, including all VAVs associated with AHU 209. Spot check North wall for mold and water damage. Replace EWH 201. This will will take place in an active air traffic break area. Contractor will be required to develop a plan of action that will limit disturbance to occupants and keep them safe. Phase 5: Demolish AHU 16 and 17 and provide and install new AHUs. Only one unit will be removed from service at a time. Contractor may need to provide adequate temporary air conditioning to all affected zones. Phase 6: Demolish AHU 216, 217, 219, 220, and 221, and provide and install new AHU units. Only one unit will be removed from service at a time. Contractor may need to provide adequate temporary air conditioning to all affected zones. Phase 7: Demolish AHU 301 and provide and install new unit and complete all associated work, including the replacement of all VAVs associated with AHU 301 and the replacement of FC 401, EF 402, RF 101, and RF 301. This work will take place in an active air traffic work area. Contractor will be required to develop a plan of action that will limit disturbance to occupants and keep them safe. IMPORTANT DATES / TIMES (SEE ATTACHED RFO COVER LETTER & RFO SECTIONS L & M FOR COMPLETE DETAILS): RSVP FOR SITE VISIT BY 3:00PM CENTRAL TIME, THURSDAY, MARCH 10, 2022 SITE VISIT SCHEDULED FOR 10:00AM CENTRAL TIME, MONDAY, MARCH 14, 2022 QUESTIONS DUE BY 5:00PM CENTRAL TIME, THURSDAY, MARCH 24, 2022 OFFERS DUE BY 5:00PM CENTRAL TIME, WEDNESDAY, APRIL 6, 2022 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Transportation Terminals

$2,986,734.00

Public - Federal

Renovation

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
338
Active Projects
220
Bidding Soon
4,335
All Active Projects
1,798
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 13, 2022

June 13, 2022

July 18, 2023

img_map_placeholder

16600 John F Kennedy Blvd, Houston, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.