Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Jacksonville, Arkansas. Completed plans call for site work for a water / sewer project.
The project consists of the construction of approximately 1,400 linear feet of gravity sewer, 400 linear feet of PVC force main and related appurtenances together with incidental and ancillary work. Each Bidder must deposit with his bid, security in the amount, form, and subject to the conditions provided in the Information for Bidders. No bidder may withdraw his bid within 60 calendar days after the actual date of the opening thereof. The Owner reserves the right to waive any informalities in the bidding and to reject any and all bids. All Bidders must be licensed in accordance with the requirements of the Arkansas Contractors Licensing Board in accordance with Act 150 of 1965, as amended. All bidders must be qualified in all respects to do business in Arkansas. Bidder agrees that the Work will be substantially complete within 90 calendar days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 120 calendar days after the date when the Contract Times commence to run. Contractorshall furnish a performance bond and a payment bond, each in an amount at least equal to the Contract Price. DESCRIPTION OF WORK A. The work included in this Contract consists of the furnishing of all tools, labor, equipment, materials, and supplies necessary to fully construct to the satisfaction of the Owner of the JP Wright Loop Road Sewer Adjustment project in Jacksonville, Arkansas, together with all incidental and ancillary work as shown on the Drawings. B. Whenever in these Documents the word "Engineer" appears, it shall be understood to mean Crist Engineers, Inc., acting either directly or indirectly as authorized agents of the Owner. In these Documents where the word "Owner" appears, it shall be understood to mean the Sewer Commission of the City of Jacksonville, Arkansas. C. Work or material not specifically mentioned in the Specifications, but designated on the Drawings, or forming an essential part of the Work mentioned or designated, shall be furnished and installed by the Contractor as though specifically mentioned. D. Construction of the work shall be by one General Contractor, utilizing Subcontractors for those specialties and portions of the Work that the General Contractor chooses to subcontract. All Subcontractors are subject to approval by the Owner in accordance with applicable sections of the Supplemental General Conditions and General Conditions to these Specifications. The General Contractor shall maintain a responsible representative on-site whenever his subcontractors are on-site and engaged in the Work. E. The Drawings show the proposed location and details of construction work in this Contract. All work shall be performed by the Contractor in a thorough and workmanlike manner, in full accordance with the Drawings and Specifications by skilled and competent workmen well experienced in such construction methods and techniques. F. Any reference in these Specifications to an engineering standard (such as ASTM) shall be to the latest version or edition as of the Bid Date
Award
Water / Sewer
$795,036.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 2, 2022
March 4, 2022
N J P Wright Loop Rd, Jacksonville, AR
Related To This Project
Jacksonville, AR
Bid Date: Nov 22 2021
Jacksonville, AR
--
Jacksonville, AR
--
Jacksonville, AR
--
Jacksonville, AR
--
Jacksonville, AR
Bid Date: Dec 18 2023
Jacksonville, AR
Bid Date: Jan 11 2024
Jacksonville, AR
Bid Date: Feb 08 2024
Johnson Wastewater Treatment Plant (WWTP) Plant Improvements Equipment Procurement Project - 4577086
Jacksonville, AR
Bid Date: Jan 27 2022
Jacksonville, AR
Bid Date: Sep 01 2023
Jacksonville, AR
Bid Date: Sep 01 2023
Jacksonville, AR
Bid Date: Sep 17 2024
Jacksonville, AR
Bid Date: Sep 15 2023
Jacksonville, AR
Bid Date: Aug 15 2023
Jacksonville, AR
Bid Date: Aug 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.