BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 24, 2022 at 8:00 PM

Updated January 23, 2025

Site work and paving for a bridge / tunnel in Norwood, Massachusetts. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of June 24, 2022, construction is underway. Bidders must be pre-qualified to perform the work described in these specifications in accordance with Massachusetts General Law (MGL) Chapter 29, Section 8B and Chapter 90, Section 34. The contractors must be pre-approved by Mass. Highway Department prior to receiving an official proposal form. A certified check or bid bond, with acceptable surety in favor of the Town of Norwood and equal to at least five percent (5%) of the bid, must be submitted with the bid. The successful bidder shall, within ten (10) days of notification of award furnish the Town a performance bond and labor and materials bond in an amount equal to one hundred percent (100%) of the bid. Bids shall be prepared, considered, and the contract awarded in accordance with all statutes governing such contracts (MGL Chapter 30 and Chapter 149 as amended). Every General Bid shall be on forms furnished by the Town. Bids submitted on other forms may be rejected. The award of the contract shall be made within 30 working days after the opening of General Bids, Saturdays, and Sundays excluded. An award will not be made to a Contractor who is not properly equipped to undertake and complete the work. The right is reserved to waive any informality and to reject any or all bids in accordance with the provisions of MGL as amended. The Town of Norwood notifies all bidders that it will affirmatively insure that minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, gender, color, creed or national origin in consideration for an award. The Construction Phase is a combined MBE and WBE goal of 10.4%. A reasonable representation of both MBE and WBE firm participation is required. A Schedule for Participants is to be included with your bid. The right is reserved to reject any or all bids or to accept any part of a bid or the one deemed best for the Town. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Under Construction

Bridges / Tunnels

$748,965.00

Public - City

Paving, Site Work

16

7

18

8

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
613
Active Projects
341
Bidding Soon
4,419
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2022

February 28, 2022

Project location map

Westover Pkwy, Norwood, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.