EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 26, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Lincoln, Maine. Completed plans call for the renovation of a educational facility.

RSU #67 School District (District) will receive sealed Bids for selective Classroom Unit Ventilator Replacements and DDC System Upgrades in accordance with the Invitation to Bid, Bid Form, Agreement, General Conditions, Supplementary Conditions, Specifications, and Drawings. The work shall generally consist of the replacement of approximately (18) Classroom Unit Ventilators at the Ella P Burr Elementary School, and (8) Classroom Unit Ventilators at the Mattanawcook Jr. High School. The work will generally include replacing existing units with new; replacing incidental steam piping and valves/fittings; replacing existing pneumatic controls with DDC; modifying outside air intake ductwork as needed; modifying adjacent casework. The project shall be substantially completed by August 19, 2022. The successful Bidder shall perform the work and furnish a Performance and Payment Bond, each in the amount of 100% of the Contract price with a corporate surety authorized to do business in the State of Maine. The Contractor shall guarantee all materials and equipment furnished and work performed for a period of one year from the date of substantial completion. The Performance Bond shall remain in full force and in effect through the guarantee period. The District reserves the right to reject any or all Bids, to waive any technical or legal deficiencies, to reject any unbalanced bids, to accept any Bid that it may deem to be in the best interests of the Owner, to negotiate the Contract Price with any Bidder, and to omit any item or items deemed advisable for the interest of the Owner.

Post-Bid

Educational

$100,000.00

Public - City

Renovation

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Air Distribution, Air Duct Accessories, Dampers, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Ventilators
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Raceway and Boxes for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
11
Bidding Soon
150
All Active Projects
67
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2022

March 21, 2022

img_map_placeholder

Multiple Locations, Lincoln, ME


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

School District Classroom Unit Ventilator Replacements and DDC System Upgrades

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.