EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 15, 2022 at 7:00 PM

Updated October 1, 2024

Site work and renovation of a playground / park / athletic field in Kent, Washington. Completed plans call for the renovation of a playground / park / athletic field; and for site work for a playground / park / athletic field.

The project will include installation of a new play-ground and swings; replacement and repair of sections of the park loop trail, installation of a stone stairway, landscaping and irrigation improvements. Should a contract be executed, it is the contractor's responsibility to corn-ply with all COVID-19 work-place health and safety measures established by the state Department of Labor & Industries or otherwise imposed by the Governor, the state Department of Health, or the Local Health Officer of Seattle-King County Public Health, or subsequent modifications to such health and safety measures as those authorities may issue, including providing all needed personal protective equipment. The Engineer's estimated range for this project is approximately 450,000 to $500,000. For questions, please email Bryan Higgins Bhiggins@kentwa.gov. The email Subject line should read "Chestnut Ridge Park Bidder Inquiry." Bryan can also be reached by phone at. 253-856-5113. All questions must be received. by 4:00 pm on. January 24, 2022. Apprentice Utilization Require-ments are mandatory for all public works estimated to cost one mil-lion dollars or more; in which case no less than 15% of the labor hours must be performed by apprentices. KCC 6.01.030. A cashier's check, cash or sure-ty bond in the amount of 5% of the bid must be included with the bid. The City of Kent reserves the right to reject any an.d all bids on any or all schedules or alter-nates or to waive any informali-ties in the bidding and shall deter-mine which bid or bidders is the most responsive, satisfactory and responsible bidder and shall be the sole judge thereof No plea of mistake in the bid shall be available to the bidder for the recovery of his/her deposit; or as a delimse to any action based upon the neglect or refusal to exe-cute a contract. Bidders must submit with their initial bid a signed statement as to whether they have previous-ly performed work subject to the President's Executive Order No. 11246. No bidder may withdraw his/ her bid for a period of sixty (60) days after the day of bid opening. Dated this 6th day of January 2022, *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Playgrounds / Parks / Athletic Fields

$500,000.00

Public - City

Renovation, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Mortaring, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Terrazzo Flooring, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Play Field Equipment and Structures, Playground Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Art, Sculptures, Furniture, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Stripping and Stockpiling, Sod Stripping and Stockpiling, Earth Moving, Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses, Plugging, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
60
Bidding Soon
988
All Active Projects
436
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2022

March 2, 2022

img_map_placeholder

9901 S 203rd St, Kent, WA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Chestnut Ridge Park Renovation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.