Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 23, 2024 at 7:00 PM
Updated January 27, 2024
Renovation of a conference / convention center in Las Vegas, Nevada. Completed plans call for the renovation of a conference / convention center.
As of January, 2024, construction commenced in early 2023 and is expected to be completed in 2025. REQUEST FOR PROPOSAL ("RFP") for PRE-CONSTRUCTION AND CONSTRUCTION SERVICES for the LAS VEGAS CONVENTION CENTER DISTRICT PHASE THREE RENOVATION PROJECT RFP # 22-4709-1 PWP #CL-2022-132 The Las Vegas Convention and Visitors Authority ("Authority") reserves the right to waive any or all provisions of this RFP and/or unilaterally modify the process to reject any or all Submittals, in its sole and unfettered discretion. The LVCC District Plan states an anticipated project budget of $540M for the Phase Three Renovation Project. All building construction, including but not limited to the construction, erection, alteration, repair, modification, demolition, addition, or improvement in whole or in part of any building structure All heavy, highway and engineering construction, including but not limited to construction, im provement, modification, demolition, of all or any part of streets and highways (including sidewalks, curbs and gutters), bridges, viaducts, rail roads, tunnels, airports, water supply, irrigation, flood control and drainage systems, sewers and sanitation projects, dams, power houses, refineries, aqueducts, canals, river and harbor projects, wharves, docks, breakwaters, jetties, quarrying of breakwater or riprap stone, or operation incidental to such heavy construction work. All concrete construction such as buildings, bridges, silos, elevators, smoke stacks, curbs and gutters, sidewalks, streets and roads, paving, alleys and roofs, of mass or reinforced concrete slabs and all flat surfaces of cement, rock asphalt, the placing, pouring and spreading and finishing of all types of bituminous concrete including all types of asphalt floors and pavements, the operation and control of all types of Vacuum Mats used in the drying of cement floors i n preparing same for finish, the operations of laser screeds, roller screeds and any other mechanical screeds, all power
Under Construction
Conference / Convention Centers
$600,000,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
