BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Lakewood, Washington. Completed plans call for site work for a water / sewer project.

Installing approximately 1,370 linear feet of 20-inch, 4 linear feet of 16-inch, 92 linear feet of 8-inch, and 2 linear feet of 6-inch diameter (Base Bid), ductile iron pipe, fire hydrants, valves, appurtenances, replacement and reconnection of water services, connections to the existing water main, and restoration. Lakewood Water District shall provide water mains, valves, meters, hydrants, services and fittings and contractor shall install. As a guarantee of good faith and as required by law, each Bid shall include a Bid Deposit in the form of cash, postal money order, certified check, cashier's check., or surety bond, payable to the order of the Lakewood Water District, for an amount not less than five percent (5%) of the amount of such Bid. Such Bid Deposits must be enclosed within the sealed envelope at the time the Bid is submit-ted to the District.. Checks shall be made payable to Lakewood Water District. Bidders shall hold their bid prices for eight-four (84) calendar days after bid opening. Deposits of the three low Bidders will be retained until a contract has been entered into between the success-ful Bidder and the District.. The selected Contractor, prior to commencing work, shall furnish a Performance and Payment Bond in an amount of not, less than the total Contract Price including the estimated taxes, W-9 form, and Insurance Certificates and Endorsements. The successful Bidder shall be required to have a business license with the City of Lakewood. 1) Substantial completion of all work shall be within 60 calen-dar days for Base Bid, beginning with the date given in the Notice to Proceed by the Lakewood Water District; and 2) Completion of all work including corrective work as required by the District's final inspection shall be within 75 calendar days for Base Bid of the date given in the Notice to Proceed. Questions concerning this request for bids may be directed to: Ian Black, Project Manager Lakewood Water District. Telephone: 253-588-4423 Email: iblack@lakewoodwater.org David Matz, Project Manager RH2 Engineering, Inc:, Telephone: 253-312-3031 email: dinatz@RH2.com

Post-Bid

Water / Sewer

$388,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
36
Bidding Soon
681
All Active Projects
289
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 24, 2022

February 24, 2022

img_map_placeholder

39th Ave SW, Lakewood, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.