BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Allen Park, Michigan. Completed plans call for site work for a playground / park / athletic field; for paving for a road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Section I - Park Avenue Pavement Replacement (Champaign Rd. to Angelique Ave.) o Remove approx. 1,750 square feet of existing walk; o Remove approx. 4,500 square yards of existing pavement; o Remove approx. 110 feet of existing storm pipes; o Remove approx. (5) storm structures; o Construct approx. 1,500 square feet of 4 inch non-reinforced concrete walk, MDOT Grade S2, 4,000psi on 4 inch sand Base; o Construct approx. 350 square yards of 6 inch non-reinforced concrete pavement, MDOT Grade P1, on new 6 inch MDOT 21AA Crushed Limestone Base; o Construct approx. 4,250 square yards of 8 inch non-reinforced concrete pavement w/integral straight curb, MDOT Grade P1, on new 6 inch MDOT 21AA Crushed Limestone Base. Paving Machine is required, a Vibratory Screed is Not Allowed; o Install approx. 1,750 feet of 6 inch storm underdrain; o Install approx. 200 feet of RCP CLIV, C76 storm pipes, 12 inch dia.; o Construct (10) storm structures; o Install (12) Inlet Filter; o All other related work; Section II - Rosedale Avenue Pavement Replacement (Wick Rd. to Moore Ave.) o Remove approx. 4,800 square feet of existing walk; o Remove approx. 7,850 square yards of existing pavement; o Remove approx. 50 feet of existing storm pipes; o Remove approx. (2) storm structures; o Construct approx. 4,600 square feet of 4 inch non-reinforced concrete walk, MDOT Grade S2, 4,000psi on 4 inch sand Base; o Construct approx. 1,000 square yards of 6 inch non-reinforced concrete pavement, MDOT Grade P1, on new 6 inch MDOT 21AA Crushed Limestone Base; o Construct approx. 7,000 square yards of 8 inch non-reinforced concrete pavement w/integral straight curb, MDOT Grade P1, on new 6 inch MDOT 21AA Crushed Limestone Base. Paving Machine is required, a Vibratory Screed is Not Allowed; o Install approx. 2,600 feet of 6 inch storm underdrain; o Install approx. 600 feet of RCP CLIV, C76 storm pipes, 12 inch dia.; o Construct (6) storm structures; o Install (12) Inlet Filter; o All other related work; Section III - Philomene Boulevard Pavement Replacement (Park Ave. to Colwell Ave.) o Remove approx. 1,750 square feet of existing walk; o Remove approx. 3,775 square yards of existing pavement; o Remove approx. 100 feet of existing storm pipes; o Remove approx. (4) storm structures; o Construct approx. 1,750 square feet of 4 inch non-reinforced concrete walk, MDOT Grade S2, 4,000psi on 4 inch sand Base; o Construct approx. 600 square yards of 6 inch non-reinforced concrete pavement, MDOT Grade P1, on new 6 inch MDOT 21AA Crushed Limestone Base; o Construct approx. 3,350 square yards of 8 inch non-reinforced concrete pavement w/integral straight curb, MDOT Grade P1, on new 6 inch MDOT 21AA Crushed Limestone Base. Paving Machine is required, a Vibratory Screed is Not Allowed; o Install approx. 1,750 feet of 6 inch storm underdrain; o Install approx. 250 feet of RCP CLIV, C76 storm pipes, 12 inch dia.; o Construct (5) storm structures; o Install (8) Inlet Filter; o All other related work; All bids shall remain firm and may not be withdrawn for ninety (90) days after the actual date of opening thereof. A properly completed Bid Bond, Certified Check or Cashier's Check in a sum not less than five (5) percent of the proposed amount of the proposal submitted, shall accompany each proposal as security for acceptance of the Contract by the lowest qualified bidder. Should the Contractor fail to enter into a Contract agreement with the Owner, through no fault of the Owner, he shall forfeit the entire amount of the security to the Owner. The City of Allen Park does not discriminate on the basis of race, color, religion, sex, or national origin. The City of Allen Park reserves the right to accept or reject any or all proposals, waive any irregularity in any proposal, and make an award of Contract in any manner, deemed in its best interest. Proposals submitted after the exact time specified for receipt shall not be considered. ENGINEER shall transmit to all such Bidders of record such addenda as ENGINEER considers necessary to provide clarification, in response to questions arising therein, or arising subsequent. Oral statements shall not be relied upon and shall not be considered as legally effective or binding. All inquiries shall be directed to C.E. Raines Company at telephone at 734-285-7510. Work shall begin on or after June 1, 2022. Time limits for Milestones (if any), Substantial Completion, Final Completion, as stated in the Contract Documents are of the essence of the Contract.

Award

Playgrounds / Parks / Athletic Fields

$1,681,925.00

Public - City

Paving, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
102
Bidding Soon
1,501
All Active Projects
617
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2022

May 2, 2022

img_map_placeholder

Multiple Locations, Allen Park, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.