Site work for a water / sewer project in Boston, Massachusetts. Completed plans call for site work for a water / sewer project.

As of December 13, 2023, an engineer has been selected and this project is in design. Contractor bidding is scheduled for February 2024. A firm timeline for construction has not been established. A detailed scope has not yet been released. *The closed solicitation has been included below for reference: The Economic Development & Industrial Corporation ("EDIC") of Boston d/b/a Boston Planning & Development Agency ("BPDA"), by its Chief Procurement Officer ("CPO"), is pleased to issue this Request for Proposals ("RFP") to perform Maritime Engineering Design Services for Rehabilitation of the South Jetty Bulkhead (hereinafter, the "Services") including site investigation, the preparation of public bid documents (per MGL c. 30 39M), permitting, cost estimating, construction administration, resident engineering, environmental oversight and peer review. The budget for the Design Services is Two Hundred-Ninety Thousand Dollars ($290,000.00). The Services are anticipated to extend through December 2023 for completion of all tasks. Please email the BPDA Procurement office at BPDA.CPO@boston.gov and include Ms. Dolores Fazio, at dolores.fazio@boston.gov for more information. The resulting contract will be awarded to the responsive and responsible respondent meeting the quality requirements, satisfying the minimum threshold criteria, and submitting the most advantageous proposal, taking into consideration the comparative evaluation criteria and the fee proposal. Respondents meeting the minimum threshold criteria and quality requirements may be interviewed as part of the evaluation process. The BPDA reserves the right to reject any or all proposals and to waive any minor informalities. The award of this contract is subject to approval by the Economic Development & Industrial Corporation of Boston Board of Directors and is contingent on availability of funds. The method of Contractor Selection has not been Determined at this time Question Deadline 06/03/2024 Please submit any and all General Bidder questions by June 3 to the BPDA Procurement Office at BPDA.CPO@boston.gov and JackToland / Real Estate at Jack.Toland@boston.gov / BPDARealEstate@boston.gov. The sites listed in this IFB may be visited by bidders independently; for any questions, please email the Project Manager Collins Engineers, Inc. produced construction documents to complete the project. The proposed improvements at South Jetty and East Jetty will include demolition and removal of 1,100 linear feet (50,000 square feet) of the existing concrete deck, installation of approximately 560 linear feet of new bulkhead, and removal of approximately 4,000 cubic yards of existing soil stockpiled adjacent to East Jetty that was generated from the excavation to facilitate prior repairs. The scope of work is as follows: Demolition and removal of approximately 1,100 linear feet (50,000 square feet) of the existing concrete deck at the South and East Jetty to prevent total collapse of the wharf into the water: o The concrete deck will be removed up to the cold joint that runs parallel to the bulkhead where the inner-most piles are in better condition. o Removal of the outer-most deck will relieve the loads imparted on the deteriorated piles and prevent movement and impact to the surrounding infrastructure, including the existing steel sheet pile bulkhead and parcels on the landside. o The existing piles beneath the wharf will remain in place; however, their failing pile jackets consisting of rebar cages and concrete encasement will be removed along with the existing timber fender piles on the outer edge of the wharf

Bid Results

Water / Sewer

$9,646,524.00

Public - City

Site Work

33

25

16

8

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
548
Active Projects
325
Bidding Soon
4,201
All Active Projects
1,788
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 18, 2024

September 16, 2024

May 2, 2025

img_map_placeholder

3 Dolphin Way, Boston, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.