BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 8, 2022 at 8:00 PM

Updated September 14, 2023

Site work, asbestos abatement and renovation of an educational facility in Flinton, Pennsylvania. Completed plans call for the renovation of a educational facility; and for asbestos abatement for a educational facility.

The Glendale School District will receive bids for Renovations to the High School Science Classrooms for the Glendale Jr. Sr. High School. It is the intent of the Owner to enter into separate contracts as follows: Contract No. 1 General Construction Contract No. 2 HVAC Construction Contract No. 3 Plumbing Construction Contract No. 4 Electrical Construction Contract No. 5 Asbestos Removal Contractors desiring to bid the Asbestos Removal Contract may obtain same by contacting Microbac Laboratories. Bids shall include a Bid Security Bond or Certified Check, payable to Glendale School District, in an amount of five percent (5%) of the bid, in accordance with Instructions to Bidders, as included in the Contract Documents. Phase 1A Start date, June 6, 2022 End date- August 12, 2022 Phase 2 Start date, June 6, 2022 ; End date- November 4, 2022 FINAL PROJECT COMPLETION DATE - NOVEMBER 4, 2022 FINAL PROJECT CLOSEOUT COMPLETION DATE - DECEMBER 4, 2022 1. The HVAC Contractor shall remove the existing HVAC equipment and systems as indicated in the contract documents. This shall include but not be limited to: uni ventilators, ductwork, chilled water and hot water piping, exhaust fans, roof ventilators, valves, hangers, insulation, unit heaters, miscellaneous heating/cooling equipment, fans, controls, etc. Demolition plans have been provided to give the Contractor the general scope of demolition work required. The Contractor shall visit the site to better understand the work involved. Any discrepancies shall be brought to the attention of the Engineer before proceeding with the work 2. Note that this is a phased project. The HVAC Contractor shall coordinate his work with the General Contractor. All work by the HVAC contractor that is out of phase work from the phasing plan and during the school year shall be completed during second shift, third shift, and weekends as required. Refer to the Architectural phasing plan prior to bidding. 3. Provide piping (hot water, chilled water, condensate drain lines, and all other piping indicated in the contract documents), and associated valves, traps, pipe accessories, insulation, hangers, miscellaneous structural steel as required, and all accessories asshown and hereinafter specified. 4. Provide new medium pressure and low velocity ductwork, VAV boxes, insulation, grilles, registers, diffusers, dampers, fire dampers, supports, equipment and all other accessories and equipment as shown, specified and required for complete operating air distribution systems 5. Provide hot water heating equipment such as cabinet unit heaters, etc. Include all piping, supports, valves, and all other associated accessories. 6. Installation of mini split system for the server room area including all evaporator unit, condensing unit, piping, wiring, controllers, ductwork and all other associated accessories. Custom Bid Result Canfield development Asbestos Removal $27,500 Hallstrom-Clark Electric, Inc Electric Constraction $198,800 K & K Plumbing Co. Inc Plumbing Construction $159,975 John Hall Inc Hvac Construction $529,700 JC ORR & Son inc General Construction $694,450

Award

Educational

$529,700.00

Public - City

Asbestos Abatement, Renovation, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
0
Bidding Soon
576
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2022

March 14, 2022

Project location map

1466 Beaver Valley Rd, Flinton, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.