BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, renovation and addition to an educational facility in Springfield, Missouri. Completed plans call for the addition of a 78,000-square-foot, four-story above grade, one-story below grade educational facility.

*A construction manager has been awarded. Bid packages are expected to be released in fall 2022. Groundbreaking must occur December of 2022. The project is a +/-78,000 GBASF, four story (plus a basement) addition that will house research laboratories, student space, and offices. The addition will allow Temple Hall to have a more substantial, more welcoming presence to the most prominent campus adjacent to Hammons Fountain. Temple Hall has eight entrances, creating safety concerns. This new addition should help pull students into the building with a new main entry and minimal secondary entrances. The proposed scope of work includes the following potential elements described below: Temple Hall is the Home of the College of Natural and Applied Sciences. The building includes lab, academic, and office space for biology, chemistry, geography, geology and planning departments. Due to space constraints, these departments also occupy various other spaces throughout campus and are not able to be entirely housed in Temple Hall. Temple Hall is a fourstory building built in 1971 contains approximately 126,000 square feet. It is a cast-in-place concrete structure that has seen minor renovation work over its 50-year life. However, the building did receive a vivarium addition in 2011 and a greenhouse addition in 2019. A multiphased renovation/addition to Temple Hall will allow the advancement of sciences for decades to come. The first phase will comprise a building addition on the northeast corner of the building to house research laboratories. Due to the short floor-to-floor height of the existing building, required ventilation cannot be provided for the existing laboratories. Once Phase I is complete, Phase II will provide a backfill renovation to the existing building. All project phases must be consistent in design, creating a unified building upon completion. Part of the challenge for this project will be the timing for the construction work to be done. The building will need to remain functional during the renovation or construction phase. Therefore, the consultant should work with the college to develop a schedule that meets both the University's needs and be as efficient as possible for the contractor executing the renovation. It is expected that once the renovation is complete, the College of Natural and Applied Sciences will vacate other University buildings and be incorporated into the design of the addition and renovation. However, work in other University buildings will be outside the scope of this contract. Missouri State University is accepting qualifications in accordance with RSMo. Sections 67.5050 and 67.5060, for a Construction Manager at Risk (CMAR) team member to provide preconstruction and construction services for the Addition and Renovation to Temple Hall. Missouri State University will be using a two-step CMAR selection process in accordance with RSMo. Sections 67.5050 and 67.5060. All prospective bidders/respondents are hereby cautioned not to contact any member of missouri state university staff or officials other than the specified contact person(s). Minority-Owned, Woman-Owned, and Small Business Enterprises are encouraged to respond to this solicitation. Short List Announced by Missouri State University: Friday, January 28, 2022 Issue Requests for Proposals: Friday, January 28, 2022 Request for Proposals Due: Friday, February 11, 2022 Interviews of Short List Participants: Week of February 14, 2022 Final Selection Announced: Friday, February 25, 2022 Anticipated Approval by Board of Governors: Wednesday, March 16, 2022 Anticipated Construction Start Date: December 2022 Anticipated Construction Completion Date: TBD Proposal questions or clarification prior to submittal may be directed to Laura Jean Derrick Phone: 417-836-7625 / Email: LJDerrick@MissouriState.edu. The firm shall be capable of meeting the project schedule and have the resources available to begin and complete each phase of work. Anticipated commencement of the work is December 2022 with a substantial completion date for construction of the phase 1 addition by the beginning of summer 2024. The phase 2 existing temple renovation scope shall be substantially complete by December 2024

Award

Educational

$55,400,000.00

Public - State/Provincial

Addition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
41
Bidding Soon
659
All Active Projects
285
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 24, 2022

December 1, 2022

December 31, 2024

img_map_placeholder

910 S John Q Hammons Pkwy, Springfield, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.