Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a playground / park / athletic field in Kirksville, Missouri. Completed plans call for site work for a playground / park / athletic field.
The City or Kirksville, Missouri is requesting proposals for the construction and installation of skate park features at the existing skate park site at North Park.The City is looking for proposals from qualified firms that will offer quality,long lasting amenities that can be relocated without affecting the integrity of the features. Open format is acceptable, but please be succinct and follow the format outline in the Submission Requirements. For questions directly related to any matter contained within this RFP shall be directed to: Rodney Sadler Parks and Recreation Director Kirksville Parks and Recreation Department rsadler@kirsksvillecity.com 660.627.1485 The City of Kirksville intends to proceed with a proposal in early winter of 2022 to allow for construction and installation to be completed for use by the community in the summer of 2022 The City intends to spend a maximum of $75,000 for the design, construction, installation of the skate park features. Pre-construction Meeting and Issuance of Notice to Proceed - March 10, 2022 Construction and Installation Complete - June 3, 2022 The City of Kirksville reserves the right to accept or reject any proposal or any part thereof or any combination of proposals and to waive any or all formalities.The City reserves the unilateral right to reject any or all proposals and to negotiate changes to proposals with any respondent. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The City is looking for proposals from qualified firms that will offer quality, long lasting amenities that can be relocated without affecting the integrity of the features. The City requests proposals that ensure the following: o Design and construction of skate park amenities including ramps, platforms, halfpipes, or other comparable skating/biking features. o Constructed of materials suitable for being left outdoors during harsh winter seasons of Northeast Missouri. Steel construction is preferred, with other construction materials to be considered based on past performance. o Features should be designed for use by a wide range of skill levels and ages. o Features should be designed and installed to work with the existing concrete and steel skate features as shown in Attachment #1. The City of Kirksville intends to proceed with a proposal in early winter of 2022 to allow for construction and installation to be completed for use by the community in the summer of 2022. The City understands that COVID-19 has caused delivery delays for materials for all construction projects, and considerations will be given for these delays. The City intends to spend a maximum of $75,000 for the design, construction, installation of the skate park features
Award
Playgrounds / Parks / Athletic Fields
$75,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 3, 2022
March 10, 2022
3000 Novinger St, Kirksville, MO
Related To This Project
Kirksville, MO
--
Kirksville, MO
Bid Date: Oct 03 2023
Kirksville, MO
Bid Date: Nov 16 2023
Kirksville, MO
Bid Date: Oct 17 2023
Kirksville, MO
Bid Date: Mar 19 2019
Kirksville, MO
Bid Date: Oct 20 2023
Kirksville, MO
Bid Date: Oct 20 2023
Kirksville, MO
Bid Date: Oct 19 2023
Kirksville, MO
Bid Date: Mar 24 2022
Kirksville, MO
Bid Date: Mar 31 2022
Kirksville, MO
Bid Date: Feb 28 2022
Kirksville, MO
Bid Date: Mar 15 2022
Kirksville, MO
Bid Date: Mar 15 2022
Kirksville, MO
Bid Date: Mar 15 2022
Kirksville, MO
Bid Date: Feb 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.