Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Westbrook, Maine. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The work includes: The installation of a new Traffic Control Signal and pedestrian signal equipment, construction of new ADA compliant sidewalk ramps, removal of existing pavement markings, and installation of new pavement markings and all other associated work as shown on the contract drawings and documents. The contractor shall make note of the schedule requirements presented in the contract documents. The contractor shall have 90 calendar days to complete the work. Final completion of the work shall be by June 30, 2024. The Issuing Office is the City of Westbrook City Hall, 2 York Street, Westbrook, ME 04092, ATTN: City Clerk's Office. Electronic (PDF) copies of the Contract Documents may be obtained by contacting Katherine Kelley at kkelley@westbrook.me.us or (207) 854-0660 ext. 3012. To be considered a responsive Bidder, the Contractor shall have obtained one set of plans and specifications electronically (PDF format) from the City. The Bid will not be awarded to the Bidder unless a record for obtaining documents from the City exists. A Pre-Bid Conference will not be held for this project. All questions shall be directed, in writing, to Katherine Kelley at kkelley@westbrook.me.us at least three (3) business days before the bid opening date. Questions received after this time will not be addressed. Responses from the City that substantially alter this RFP will be issued in the form of a written addendum to all those that have expressed interest in the project. Oral explanations or interpretations given before the award of contract will not be binding. A bid must be accompanied by Bid security made payable to Owner in an amount of 5% of Bidder's maximum bid price and in the form of a certified check or Bid bond issued by surety meeting the requirements of the General Conditions. No bid may be withdrawn for at least 60 days after receipt of bids unless released by the Owner. A completed Bid Form, Bid Security, Experience and Qualifications Statement with verification of bonding capacity and other attachments identified in the instructions must be submitted with the Bid. Within five days after the receipt of bids, the apparent low responsive bidder shall deliver to the Engineer and Owner for review and acceptance the listing of subcontractors, suppliers or entities for the work listed in Supplementary Condition SC-7.06. The successful bidder must furnish within 10 calendar days after the Notice of Award the required number of copies of the signed Agreement, 100% Performance Bond, 100% Payment Bond, Insurance Policy and begin execution of this contract within 10 calendar days following the Notice to Proceed. The General Contractor shall be responsible for the full amount the 100% Performance Bond and the 100% Payment Bonds. Combining bonds of subcontractors is not acceptable.
Award
Roads / Highways
$473,544.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
March 16, 2023
March 30, 2023
June 30, 2024
Bridgton Rd, Westbrook, ME
Related To This Project
Westbrook, ME
Bid Date: Mar 15 2023
Westbrook, ME
Bid Date: Apr 06 2023
Westbrook, ME
--
Westbrook, ME
Bid Date: Apr 28 2023
Westbrook, ME
--
Westbrook, ME
Bid Date: Jul 13 2023
Westbrook, ME
--
Westbrook, ME
Bid Date: Mar 03 2022
Westbrook, ME
Bid Date: Mar 07 2023
Westbrook, ME
--
Westbrook, ME
--
Westbrook, ME
--
Westbrook, ME
--
Westbrook, ME
Bid Date: May 08 2023
Westbrook, ME
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--