Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 26, 2024 at 8:00 PM
Updated September 27, 2024
Site work for a water / sewer project in Greeley, Colorado. Design plans call for site work for a water / sewer project.
The Sanitary Sewer Masterplan has identified a need to divert flows from the existing 8" sewer main in 25th Street/Centerplace Drive and 38th Avenue. The area has seen significant growth of over the last 20-years and the downstream system was not sized sufficiently to convey the projected growth of the upstream development. The proposed project will divert flows from 25th Street to 38th Avenue to alleviate the capacity concerns in the downstream system. Requires new sewer main infrastructure to be installed in Centerplace Drive, which is a major access for the Centerplace Development and residences in the area. Coordination with the landowner will be required for alignments through the proposed property. This will likely require crossing large diameter storm infrastructure in the area, that may control line and grade of the proposed sewer main. As of September 26, 2024, this project is in design now. Construction should begin in the summer of 2025.
Design
Water / Sewer
$370,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2025
E 25th St, Greeley, CO
Related To This Project
Greeley, CO
--
Greeley, CO
--
Greeley, CO
Bid Date: Dec 08 2020
Greeley, CO
Bid Date: Mar 17 2021
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
