BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 7, 2022 at 7:00 PM

Updated September 15, 2023

Site work and paving for a road / highway in Killeen, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

For furnishing all necessary materials, machinery, equipment, superintendence and labor for Estancia Blvd. Paving from 56th Street to Highway 191 Service Road. Job No. 220090-30 ITEM #1801400 The Contractor further agrees that he will commence work within 10 calendar days after the date written notice is given to the Contractor, and will prosecute the work in such a manner that the work shall be completed in accordance with the terms of this agreement within 120 working days Street and roadway excavations shall consist of required excavation within the limits of the street or roadway (except excavations otherwise classified, such as excavation for structures, sewers, water lines, channels, etc.), the removal and proper utilization or disposal of all excavated materials, and the constructing, shaping, and finishing of all earthwork on the entire length of street or roadway and approaches to same in conformity with the required lines, grades, and typical cross section and in accordance with specifications and requirements herein outlined.

Bid Results

Roads / Highways

$395,680.00

Public - City

Paving, Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2022

February 24, 2022

Project location map

Estancia Blvd, Killeen, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.