Site work and paving for a mixed-use development in Oregon, Wisconsin. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
CONTRACT "A" - GENERAL SITE CONSTRUCTION 1. Park development project with work including, but not limited to, stripping and placing topsoil, common excavation, asphalt pavement, pavement striping, concrete curb and flatwork, dense graded base, storm sewer, underdrain, sanitary and water service, fencing, netting systems, erosion control, irrigation, landscaping, seeding, and site restoration. 2. Alternate Bids as represented in the Contract Documents. 3. All necessary work to complete the proposed contract as represented in the construction documents shall be included in the CONTRACTOR'S bid. CONTRACT "A - ALTERNATE 1" - PICKLEBALL COURT CONSTRUCTION 1. Hard court development of six pickleball courts with work including, but not limited to stripping and placing top soil, common excavation, asphalt pavement, acrylic surfacing, dense graded base, fencing, net posts, storm sewer, erosion control, seeding, and site restoration. 2. All necessary work to complete the proposed contract as represented in the construction documents shall be included in the CONTRACTOR'S bid. CONTRACT "A - ALTERNATE 2" - SOFT SURFACE PLAYGROUND CONSTRUCTION 1. Provide and install playground equipment, basecourse, concrete walk and pour in place surfacing for a soft surface playground. 2. All necessary work to complete the proposed contract as represented in the construction documents shall be included in the CONTRACTOR'S bid. CONTRACT "A - ALTERNATE 3" - ADULT PLAYGROUND CONSTRUCTION 1. Provide and install adult playground equipment, basecourse, concrete curb and pour in place surfacing for a soft surface adult playground. 2. All necessary work to complete the proposed contract as represented in the construction documents shall be included in the CONTRACTOR'S bid. CONTRACT "A - ALTERNATE 4" - BASEBALL FIELD NETTING SYSTEM 1. Provide and install netting foundations, posts, nets, fencing and hardware for 3 baseball field in-line netted backstops in lieu of 3 chain link backstops. 2. All necessary work to complete the proposed contract as represented in the construction documents shall be included in the CONTRACTOR'S bid.
Post-Bid
Playgrounds / Parks / Athletic Fields
$1,000,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 24, 2022
April 11, 2022
110 N Oak St, Oregon, WI
Related To This Project
Oregon, WI
Bid Date: Apr 19 2022
Oregon, WI
Bid Date: May 05 2022
Oregon, WI
Bid Date: Jun 09 2022
Oregon, WI
--
Oregon, WI
Bid Date: Jul 14 2022
Oregon, WI
Bid Date: Jul 14 2022
Oregon, WI
Bid Date: Aug 19 2022
Oregon, WI
Bid Date: Mar 10 2022
Oregon, WI
Bid Date: Dec 08 2022
Oregon, WI
Bid Date: Feb 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.