BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Towson, Maryland. Completed plans call for the renovation of a educational facility.

Bid Package 2.09.1-Resilient Tile Flooring Barton Malow is the Construction Manager for Towson University for this project. Total Project Construction Cost is $40M-$50M. The Towson University Glen Tower Residence Complex was constructed in 1983. The Complex includes 4 high- rise towers accommodating 1,617 beds with a centralized dining hall building and an outdoor plaza connecting the towers and dining. The project scope includes facade improvements to the Towers to cover existing concrete facade, replacement of storefront window assemblies for improved thermal performance, and replacement of existing canopies. In addition, the Tower's HVAC and supporting electrical systems will be upgraded. Infrastructure improvements include stormwater, sanitary, and water supply lines. Plaza improvements include new seating, hardscaping, and landscaping. One Tower will be unoccupied and renovated at a time for a period of 12 months. The remaining Towers and Dining Hall will be occupied and functional throughout construction. Field construction will start on June 1, 2021 and will continue for the next 48 months through July 2025. Bid Package 2.09.1-Resilient Tile Flooring is scheduled to be advertised and released to bidders through Building Connected starting on January 12, 2022. Bids will be due at the Building Connected Website on February 3, 2022 at 5:00PM. This project has overall 30% MBE goals, with 7% African-American and 4% Asian-American subgoals. Request for information or clarification related to this solicitation shall be directed to Maxwell Jenney, Project Engineer, Barton Malow Company, 300 W. Pratt St. Suite 310, Baltimore, MD 21201. Phone: 443-690-7570 ; Email: Maxwell.Jenney@bartonmalow.com *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Educational

$50,000,000.00

Public - City

LEED Certification, Renovation

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
93
Bidding Soon
2,400
All Active Projects
924
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2022

April 4, 2022

img_map_placeholder

8000 York Rd, Towson, MD

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.