BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Buckeye, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Sun City Festival Parcels K2/N2, H2 Phase 1 and 2 Concrete This project includes the furnishing of all materials, labor, equipment, tools, transportation, traffic control, and services required for the installation of the reclaimed and potable water lines, and the necessary City of Buckeye requirements for final acceptance Each proposal shall be accompanied by a certified check, cashier's check or surety bond for ten percent of the amount of the bid included in the proposal as a guarantee that the contractor will enter into a contract to perform the project in accordance with the plans and specifications. Notwithstanding the provisions of any other statute, the surety bond shall be executed solely by a surety company or companies holding a certificate of authority to transact surety business in this state issued by the director of the department of insurance pursuant to title 20, chapter 2, article 1. The surety bond shall not be executed by an individual surety or sureties, even if the requirements of 7 101 are satisfied. The certified check, cashier's check or surety bond shall be returned to the contractors whose proposals are not accepted, and to the successful contractor upon the execution of a satisfactory bond and contract as provided in this article Developer reserves the right to reject any or all proposals and/or withhold the award for any reason. Developer also reserves the right to waive any informality related to this solicitation in Developer's sole discretion, and reserves the right to reject any and all proposals, and resolicit and/or cancel this solicitation ENG-21- PLZS-21-00111/127/160 4191448000 20211100537 10/13/2021 08:05 005275-6-1-1-M Substantial Completion = 30 Calendar days from Start Date identified in Notice to Proceed Final Completion = 60 Calendar days from Start Date identified in Notice to Proceed Alpha Project No. 21-CR-12349

Award

Roads / Highways

$2,323,360.00

Public - City

Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
11
Bidding Soon
681
All Active Projects
222
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.