Site work and renovation of a water / sewer project in Birmingham, Alabama. Working plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Civil, mechanical, structural, building, HVAC, electrical, instrumentation and control, and/or appurtenant work at the following facilities at Village Creek Water Reclamation Facility o Plant 001: Fuel Island, Screen Chamber, Grit Removal System, Pre-Aeration Basins, Primary Clarifiers, Primary Pumping Station (PPS), new PPS Electrical Building, Screw Lift Pump Station (PS) No. 1, Perimeter Drainage PS, Stage 2 Aeration Basins, Aeration Blower Building, Stage 2 Final Settling Tanks, Filter Building, Chlorine Contact Chamber, RAS/WAS PS, Thickened Sludge PS, Bar Screen/ Comminutor Basin, and Plant Service Water yard piping o Plant 002: Portal No. 1, Influent PS, Surge Basins (including Junction Box No. 2), Influent Structure, Aeration Basins, Final Clarifier No. 8, Filters (including Filter Operations Building, Filter Blower Building, and Backwash PS), Ultraviolet Disinfection, RAS/WAS PS, and Sludge Blender, Sludge Thickeners, and Thickened Sludge PS o Plant 001 Solids Handling: "New" Digester Area Switchgear Building (Old Boiler Building), Elutriation PS, Dewatering Building, Sludge Drying Beds, High-Pressure Gas Compressors, and Digester Gas Sphere o Plant-Wide: Relocation, replacement, and provision of pole-mounted lighting fixtures; pressure washing of surfaces; removal of paint (including abatement of lead-based paint) and application of weatherproofing coatings; door and window replacement, inspection, and repair; and miscellaneous site improvements work at the previously listed facilities and other facilities located at Plant 001, Plant 002, and Plant 001 Solids Handling The foregoing description shall not be construed as a complete description of all work required. Engineers estimate of probable construction cost is $27,220,000 to $34,060,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Work to be done under this Contract and in accordance with these Specifications and Drawings consists of furnishing all equipment, superintendence, labor, skill, materials, and all other items necessary for the construction of the Village Creek Water Reclamation Facility Reliability and Biological Improvements - Phase 3 including, but not limited to, all civil, mechanical, structural, building, electrical, instrumentation and control (I&C), and heating, ventilating, and air conditioning (HVAC) work, and all appurtenant work, complete in place, tested, and ready for full operation, including temporary facilities as required, all in conformance with the Contract Documents and as directed by the Engineer. The Project site (site of the Work) is at the Village Creek Water Reclamation Facility located at 1440 Pleasant Hill Road, Birmingham, Alabama 35224. The Contractor shall perform all work required for such construction in accordance with the Contract Documents and subject to the terms and conditions of the Contract, complete and ready for use Questions concerning meaningor intent of Bidding Documents shallbe submitted to Dan Sebusch,PE,Senior Associate, Hazen and Sawyer,at email dsebusch@hazenandsawyer.com no later than 5p.m. Central DaylightTimeonFriday, October28, 2022.All questions must be in writingon Bidders, subcontractors, manufacturers, service providers, vendors, distributors, etc. or their representatives companys letter head. Pre-Qualification: Yes The Contractor is hereby advised that TIME IS OF THE ESSENCE on this Project. The Contract Time for this Project is six hundred ninety (690) consecutive calendar days from the effective date of the written Notice to Proceed to achieve Substantial Completion and seven hundred fifty (750) consecutive calendar days from the effective date of the written Notice to Proceed to achieve Final Acceptance Engineer's estimate of probable construction cost is $40,000,000 to $45,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All Bids Rejected.

Final Planning

Water / Sewer

$45,000,000.00

Public - County

Renovation, Site Work

220

27

41

2

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
46
Bidding Soon
553
All Active Projects
202
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2022

January 17, 2023

img_map_placeholder

1440 Pleasant Hill Rd, Birmingham, AL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.