BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Fond du Lac, Wisconsin. Completed plans call for the renovation of a detention facility.

All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $50,000. All bids received from contractors who are not certified will be rejected. Contractor certification applications and instructions for completing the form may be obtained from the DOA Website DFD Contractor Certification page This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders n general, the work consists of the upgrading steam and condensate piping along with supports within approximately 1425 lineal feet of existing utility tunnel. Installation of approximately 600 lineal feet of direct buried steam and condensate conduits. All area shall be restrored when work is complete. Base Bids will be received as a single lump sum bid for: 4) Mechanical (Heating, Ventilating, Air12 Conditioning); and 5) Electrical Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted he 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. For Site walk through - Contractors are required to contract Robert Otremba no later than seven (7) days prior to the pre-bid date. Items of note about the pre-bid walk through: 1. Contractors are to meet at the TCI Gate House lobby at 9:00 am on February 1, 2023. Contractors will be screened in the lobby. 2. Contractors will be escorted thru out project limits by TCI personal. 3. Only one (1) representative per contractor will be allowed for the pre-bid Replace Steam Distribution Pipes which consist of both steam supply and condensate return lines which serve bldg. 1102-Addams Hall at 210/Lf., Homestead (bldg.1302-Old Gov. House, bldg. 1410-Chapel & bldg. 2409) at 420/Lf. And bldg. 1107-AB (Abrahamson Housing Unit) from steam pit to bldg. at 150/Lf. Remove degraded steam distribution pipes and box conduit, replace with direct buried steam pipe. total linear ft. approx. 780'. the pre-bid walk through previously scheduled for February 1, 2023 at 9:00 am has been rescheduled to February 6, 2023 at 9:00 am. Sealed bids will be received as PDF scanned file of all required bid documents, including bid and bid bond forms with original wet signatures or properly transmitted electronic signatures (only PDF files will be accepted) emailed to doadfdmbidsubmission@wisconsin.gov (this is the preferred method); US Mail or Third-party delivery (UPS, Fedex, or DHL) to State of Wisconsin, Administration Building, 7th Floor, 101 East Wilson Street, Madison, Wisconsin 53703; or Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 42 53703.

Award

Jails / Prisons

$3,107,787.00

Public - State/Provincial

Renovation

58

27

31

6

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
35
Bidding Soon
741
All Active Projects
309
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2023

May 1, 2023

img_map_placeholder

751 Co Rd K, Fond du Lac, WI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.