Renovation of a water / sewer project in Richmond, Virginia. Completed plans call for the renovation of a water / sewer project.

The Work consists of but is not limited to the following: demolishing the existing primary clarifier internal mechanisms and installing new primary clarifier internal mechanisms inside existing Primary Clarifiers 2, 5, and 6, which are 115-ft diameter tanks. Performing cleaning, surface preparation/scarification, and installing full floor grout. The project is located at 9101 WRVA Road, Richmond, VA 23231. Bid documents consisting of contract drawings and project manuals may be obtained by visiting the Henrico County electronic document's web portal at website. Options are provided for downloading a complete set of documents or selected files from this web portal. Work included in this contract shall be Substantially Complete within 630 calendar days from the date the Contract Time commences, and it shall be complete and ready for final payment within 660 calendar days from the date the Contract Time commences. Remove and dispose of debris/solids from invert of Primary Clarifier Influent Splitter Box No. 2, and up to 5-ft inside upstream 66-in pipe (debris/solids is estimated at 50-cu. yds dry solids). Remove and dispose of debris/solids from the Primary Clarifier 2, 5, and 6 42-in influent piping (each approximately 105-ft in length), with each of the three pipe cross sections assumed to be at least 60% filled with debris/solids. Demolish existing and install new electrical controls, conduit, and lighting associated with three new primary clarifier internal mechanisms Repair miscellaneous concrete wall areas inside existing Primary Clarifiers 2, 5, and 6. This work shall be delivered as a unit cost, with quantities specified in the Bid Form. 3. Contractor shall supply and install components necessary to provide a complete and working system. Work shall further entail all other site, structural, electrical, controls, and instrumentation additions/improvements associated with the Work items above. D. The foregoing description shall not be construed as a complete description of all work required. This information is provided for the convenience of the contractor and the contractor is responsible to determine the exact quantities for the base bid. CLARIFICATION DEADLINE 2/2/2022 11:59 PM

Award

Water / Sewer

$3,250,000.00

Public - County

Renovation

4

14

13

7

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
33
Bidding Soon
829
All Active Projects
357
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2022

March 28, 2022

img_map_placeholder

9101 Wrva Rd, Richmond, VA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.