BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a road / highway in Grafton, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The project is officially known as "Edgewood Drive & Hillside Court Reconstruct (Pulverize and Overlay)". The project is described as repaving a portion of Edgewood Drive and Hillside Court with the additional alternative 1 of repaving Trail Way Drive and Trail Way Court with the additional alternative 2 of repaving Shady Lane. This project will consist of furnishing all labor, materials, and equipment necessary for the construction of the Edgewood Drive & Hillside Court Reconstruct (Pulverize and Overlay) located in the Town of Grafton. Base Bid - A. Edgewood Drive and Hillside Court - Approx. 3,700 feet - Pulverizing existing pavement, 4" overlay in two lifts, shouldering, and restoration. B. Work is described in general, non-inclusive terms as furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the: 1. Pulverization and reshaping of approximately 9,045 SY of asphalt pavement. 2. Placement and compaction of approximately 1,370 tons of asphalt binder and approximately 820 tons of asphalt surface. 3. Placement of approximately 700 tons of 1-1/4" stone as shouldering. 4. Final Restoration of all disturbed areas. ALTERNATIVE 1 A. Trail Way Drive and Trail Way Court - Approx. 2,700 feet - Pulverizing existing pavement, 4" overlay in two lifts, shouldering, and restoration. B. Work is described in general, non-inclusive terms as furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the: 1. Pulverization and reshaping of approximately 6,600 SY of asphalt pavement. 2. Placement and compaction of approximately 1000 tons of asphalt binder and approximately 600 tons of asphalt surface. Edgewood Drive & Hillside Court Reconstruct (Pulverize and Overlay) ADVERTISEMENT FOR BIDS (C) 2022 STANTEC | 193805822 00 11 13 - 2 3. Placement of approximately 20 tons of 3/4" stone as driveways along the length of the project and placement of approximately 510 tons of 1-1/4" stone as shouldering. 4. Final Restoration of all disturbed areas. ALTERNATIVE 2 C. Shady Lane - Approx. 1,000 feet - Pulverizing existing pavement, 4" overlay in two lifts, shouldering, and restoration. D. Work is described in general, non-inclusive terms as furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the: 1. Pulverization and reshaping of approximately 2,450 SY of asphalt pavement. 2. Placement and compaction of approximately 370 tons of asphalt binder and approximately 220 tons of asphalt surface. 3. Placement of approximately 190 tons of 1-1/4" stone as shouldering. 4. Final Restoration of all disturbed areas.

Post-Bid

Roads / Highways

$170,000.00

Public - City

Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
85
Bidding Soon
1,392
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2022

February 28, 2022

Project location map

Multiple Locations, Grafton, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.