Renovation of a mixed-use development in Roanoke, Virginia. Completed plans call for the renovation of a conference / convention center; and hospitality development.

The Hotel Roanoke Conference Center Commission and the Hotel Roanoke, L.L.C. hereby invite Bids pursuant to VA. CODE ANN. 2.2-4301 from firms and persons to supply and install new cooling towers at the Hotel Roanoke and Conference Center in place of the existing cooling towers. Bid requirements, Specifications and General Conditions are contained in the Details of Invitation to Bid, which is incorporated by reference into this Invitation to Bid. The selection process shall be by competitive sealed bidding. The Details of Invitation to Bid may be picked up between 8:30 a.m. and 4:30 p.m. Bids will be opened and announced to the public shortly after 2:00 p.m. by Mr. Johnson on that date. Questions or comments concerning this Invitation to Bid shall be directed to Mr. Wright. Separate cooling tower sumps by installing separator plate and valving offincoming and outgoing water, isolating one tower while leaving the other tower functioning to maintain chiller operation. Disconnect all needed piping and electrical connections from isolated tower assembly. Remove old cooling tower section from supports in its entirety. Haul all demolished material from the project site. Handle and dispose of in accordance with national, state, and local regulations. Install new cooling tower section matching above specs and secure per factory requirements. Reconnect all condenser and make up water piping per applicable statutes, ordinances, and regulations. Reconnect all electrical connections per applicable statutes, ordinances, and regulations. Install electrical heat tape to any piping that poses a freeze potential as needed and repair any pipe insulation, whether new or existing, that is removed or scraped away to make a mechanical installation, so as to maintain an equivalent insulation as existed without said mechanical installation. Align fan belts and adjust tension to factory specs. All condenser water strainers to be cleaned and checked prior to final inspection by the Assistant General Manager. 9. Preform start up procedures on new tower section to include verifying all bolt torques, electrical and plumbing connections and check operation in accordance with the manufacturer's recommendations and make all necessary adjustments. 10. Open all valves and put new tower section into operation. 11. Isolate number 2 cooling tower section and prepare for removal while leaving number 1 in operation. 12. Disconnect all needed piping and electrical connections from isolated tower assembly. 13. Remove old cooling tower section from supports in its entirety. Haul all demolished material from the Project site. Handle and dispose of existing cooling tower system and equipment in accordance with national, state, and local regulations. 14. Install new cooling tower section and secure per factoiy requirements. 15. Replacement cooling tower section matching above specifications. 16. Reconnect all condenser and make up water piping per code as needed. 17. Reconnect all electrical connections per Code. 18. Install electrical heat tape to any piping that poses a freeze potential as needed and repair any pipe insulation, whether new or existing, that is removed or scraped away to make a mechanical installation, to maintain an equivalent insulation as existed without said mechanical installation. 19. Align fan belts and adjust tension to factory specs. 20. Preform start up procedures on new tower section to include verifying all bolt torques, electrical and plumbing connections and check operation in accordance with manufacturers recommendations and make all necessary adjustments. 21. Open all valves and put new tower into operation including removing separator plates to allow both towers to work together. Separator plate to be given to Director of Engineering for future use. 22. Each tower section to have individual make up water level controls. 23. Replace make up water back flow preventor and flow valve with motorized type shut off valve

Award

Conference / Convention Centers

$265,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
9
Bidding Soon
341
All Active Projects
135
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2022

March 18, 2022

img_map_placeholder

110 Shenandoah Ave NE, Roanoke, VA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.