Published July 2, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Cape May, New Jersey. Completed plans call for the renovation of a educational facility.

Thursday 01/27/22 Deadline for Questions at 5:00 P.M. (email to jangelo@garrisonarch.com) The Project consists of Lower Cape May Regional High School 2022 Locker Room Renovations and Corridor Locker Replacement located at 687 Route 9, Cape May, New Jersey 08204. 1. Owner: Lower Cape May Regional School District, 687 Route 9, Cape May, New Jersey 08204. Contract Documents were prepared for the Project by Garrison Architects, 713 Creek Road, Bellmawr, NJ 08031 The Work consists of Locker Room Renovations and Corridor Locker Replacement including but not limited to the following, (see the construction documents for details): Contractors are strongly encouraged to visit the site of the Project before submitting costs for the project. Such site visit shall be for the purpose of familiarizing the Contractor with the conditions as they exist and the character of the operations to be carried on under the Contract Documents, including all existing site conditions, access to the site, physical characteristics of the site and surrounding areas. The Contractor shall provide a single full-time onsite Superintendent / Foreman who is present for all work at all times including, but not limited to, subcontractor work. The Superintendent / Foreman is responsible to maintain a daily log of all personnel onsite. During the complete duration of the Work, the Contractor must maintain the continued operation and function of all services and systems including, but not limited to, fire alarm, data, network, information technology, security, audio visual, electrical and HVAC. If a disruption to a system occurs, the Contractor must immediately take all actions necessary to restore the system at the earliest possible time. Any required shutdown of any system needs to be coordinated and scheduled with the Owner. The work consists of renovation of Gym Locker Rooms as indicated on the Contract Documents including but limited to selective demolition, salvage and reuse of existing lockers in the Boys Locker Rooms, new finishes, lighting, plumbing, mechanical system, electrical work and asbestos abatement. Asbestos abatement will be performed under a separate contract issued by the Owner. The Contractor shall coordinate with the asbestos abatement Contractor and provide selective demolition work to provide access to abatement area. Salvaged lockers must be fully prepared, electrostatically painted and renumbered. There is an Alternate Bid to remove and replace the existing corridor lockers. See Contract Documents for further information. Work can begin after school dismissal on June 17, 2022. This work must be substantially complete by August 19, 2022. Dispose of material according to state and local code and Section 01524 - Construction Waste Management. Restore all grades, lawns and pavement to pre-construction condition. Schedule of work sequence: 1. No work On Site can be started until all permits are received. The existing school must be completely operational during the school year. This project must be completed on or before August 19, 2022. 2. All construction preparation work, project startup, submittals, schedules, approvals, procurement, coordination, and other preparatory tasks must commence immediately upon receipt of the Notice to Proceed or the date of the fully executed Owner/Contractor Contract, whichever comes first. The Awarded Contractor must be fully prepared to deliver and install all materials and equipment on the first day of the scheduled on-site Construction period. 3. The on-site Construction period, during which all work on site is to be performed, is to start June 17, 2022. All work must be substantially complete by August 19, 2022.

Award

Educational

$1,517,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Mockups, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast Decks and Underlayment, Cast Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Cold-Formed Metal Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Gypsum Sheathing, Shop-Fabricated Structural Wood, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Steep Slope Roofing, Shingles and Shakes, Membrane Roofing, Flashing and Sheet Metal, Flexible Flashing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors, Louvers and Vents, Louvers, Door Louvers
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Terrazzo Flooring, Fluid-Applied Flooring, Resinous Flooring, Carpeting, Wall Finishes, Special Wall Surfacing, Acoustic Treatment, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Hoists, Lifting Devices, Hooks, Lifts

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
71
Bidding Soon
1,053
All Active Projects
532
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2022

June 17, 2022

img_map_placeholder

687 U.S. 9, Cape May, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2022 Locker Room Renovations and Corridor Locker Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.