EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 28, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a mixed-use development in Bel Air, Maryland. Completed plans call for the renovation of a educational facility.

Construction contractors wishing to submit proposals issued by HCPS shall be pre-qualified by HCPS by submitting a Contractors Qualification Statement (AIA Document A305-1986) three (3) days prior to receipt of bids, as described in the solicitation documents, to Harford County Public Schools Planning & Construction Department, 102 South Hickory Avenue, Bel Air, Maryland 21014. Certified Minority Business Enterprises (MBE) are encouraged to respond to this solicitation notice. The bidder or offeror is required to submit with its bid or proposal a completed Attachment 1A - Certified MBE Utilization and Fair Solicitation Affidavit and MBE Participation Schedule, as described in the solicitation documents within thirty (30) minutes of submitting the bid proposal; If there is no overall MBE goal or sub goals established for the package, then only Attachment 1A - MBE Utilization and Fair Solicitation Affidavit & MBE Participation Schedule is required at time of bid. The apparent low bidder shall submit additional minority business enterprise material and supporting data, which is specified in the bid documents within ten (10) working days after notification that the firm is the apparent low bidder. Interested contractors/subcontractors/ material suppliers may submit a request for registration as a document holder to HCPS via email. Once registered, a contractor/subcontractor/material supplier will receive access to all project bid documents from HCPS. Registered contractors/sub-contractors/material suppliers will receive all addenda issued via email. Distribution of bid document digital files as well as addenda digital files will be free of charge to the contractor/subcontractor/material supplier community. Printed documents will not be provided under any circumstances by HCPS. The contractor/subcontractor/material supplier may use any reprographic company for this purpose that they choose and must bear the cost for any printed documents. The MBE Goal Percentage for the bid HRM-22-2, FY22 Portable Classroom Relocation Project shall be 5% with no subgoals. All prime contractors and subcontractors, including certified MBE firms, are required to attempt to achieve the MBE goals from certified MBE firms approved by the Maryland Department of Transportation. The apparent low bidder shall complete and submit the Employment of Sex Offenders and Other Criminal Offenders Affidavit, (Section 00640), which is specified in the bid documents within ten (10) working days after notification that the firm is the apparent low bidder. Instructions pertaining to the bid bond, surety checks and bid performance and materials payment bond requirements are set forth in the specifications and compliance with same shall be the responsibility of the contractor submitting the bid. The Board of Education reserves the right to accept or reject any or all bids and to waive any informalities in bids received. Harford County Public Schools is an Equal Opportunity Employer and strongly encourages minority participation.

Post-Bid

Educational

$240,000.00

Public - County

Renovation

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Joists, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Siding
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Windows, Hardware, Door Hardware, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Other Specialties, Pest Control Devices
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Planting, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
227
Active Projects
114
Bidding Soon
2,731
All Active Projects
1,008
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2022

May 30, 2022

img_map_placeholder

To Be Determined, Bel Air, MD


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.