BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Sterling Heights, Michigan. Completed plans call for the renovation of a educational facility.

Proposals must be sealed with Bidder's name on the outside of the envelope and designated as follows: Project Name: FS-1-2022 Messmore Kitchen Upgrades Bid Package Number: FS-1-2022 Bid Category: General Trades Subcontractor/Vendor Name, Address, Phone Number B. Proposals shall be based on the requirements set forth in the Barton Malow Builders project manual dated November 10,2021 and construction bidding documents prepared by Integrated Design Solutions project drawings and specifications dated November 24, 2021 All Bidders are responsible for attendance at the pre-bid conference. Pre-bid conference minutes will be distributed to all attendees and invited bidders. Information disclosed in the pre-bid conference minutes will be considered part of the Bidding and Contract Documents. K. All bidders are required to prequalify to the requirements described in Document 002113 - Instructions to Bidders. Bidders must be pre-qualified for this bid package by Barton Malow Builders before document distribution or receipt of bids per the Instructions to Bidders. Barton Malow Builders reserve the right to request qualification forms or additional information from any Bidder before issuing Bidding Documents, receiving Bid Proposals or awarding the Agreement. Refer to other bidding requirements described in Document 002113 - Instructions to Bidders and Document 003100 - Available Project Information. M. Bid Proposals shall be on forms furnished by Barton Malow Builders via Building Connected. Bidders shall not withdraw or revoke Bid Proposals for a period of 90 Days after the date for receipt of Bid Proposals. N. Bidders will be required to submit with their Bid Proposals a Bid Security, in the amount of 5% of base bid, by a qualified surety authorized to do business in the state where the Project is located. O. Bidders with an Experience Modification Rate (EMR) greater than 1.0 may not be considered for contract award. P. The successful bidder will be required to enter into a contract with Utica Community Schools on the AIA Document A132 Standard Form of Agreement between Owner and Contractor, Construction Manager as Adviser, 2009 Edition. Q. The Owner reserves the right to accept or reject any or all offers.

Post-Bid

Educational

$750,000.00

Public - County

Renovation

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
80
Bidding Soon
1,454
All Active Projects
593
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2022

March 31, 2022

img_map_placeholder

8742 Dill Dr, Sterling Heights, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.