BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2022 at 7:00 PM

Updated December 17, 2024

Site work and paving for a mixed-use development in Marshall, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reconstruction and Utility Replacement on South 1st Street From George Street to Greeley Street This project consists of the following: Reconstruction and utility replacement on South 1st Street from George Street to Greeley Street, Greeley Street from West College Drive to East Saratoga Street, and Williams Street from George Street to West Maple Street. This project will include new water and sewer services to the right-of-way. Other items of work included in this project are pavement removal, aggregate base, bituminous surfacing, concrete surfacing, sidewalks, curb and gutter and other minor work. Estimated quantities of major work items for the project are as follows: COMMON EXCAVATION 4,760 CY 6" PERF PVC PIPE DRAIN 6,056 LF AGGREGATE BASE (CV) CLASS 5 4,332 CY 10" PVC PIPE SEWER 1,333 LF TYPE SP 9.5 WEARING COURSE MIX (3,C) 2,720 TON 1" WATER SERVICE (COMPLETE) 51 EA 4" CONCRETE WALK 13,244 S 6" PVC WATERMAIN 2,157 LF CONCRETE CURB & GUTTER DESIGN B618 4,993 LF 8" PVC WATERMAIN 1,088 LF .The City Council reserves the right to reject any or all bids or any part of any bid, to waive minor defects, technicalities, or any informalities in the bidding or to advertise for new proposals, and to accept that bid deemed to be in the City's best interest. Plans and Specifications are on file at the Office of the City Engineer in the Marshall City Hall located at 344 West Main Street, Marshall, MN 56258, telephone: 507-537-6773. The bids and the responsibility of the bidders will be considered by the City Council at 5:30 P.M. on Tuesday, February 8, 2022, at Marshall City Hall located at 344 West Main Street, Marshall, MN. No bidder may withdraw his bid for at least 90 days after the scheduled closing time for the receipt of bids.

Award

Sidewalks / Parking Lot

$1,647,499.00

Public - City

Paving, Site Work

36

9

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
38
Bidding Soon
388
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2022

April 18, 2022

Project location map

Multiple Locations, Marshall, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.