BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Big Bear Lake, California. Completed plans call for site work for a water / sewer project.

The Division Well No. 9 Drilling Project includes the drilling and construction of a new municipal-supply water well targeted to produce 200-300 gallons per minute (gpm). The well shall be constructed in such a manner as to produce from selected water-bearing zones encountered below a depth of approximately 120 feet below ground surface (bgs). The pilot hole will be drilled to a depth of approximately 450 feet bgs for geologic logging and downhole geophysical surveying purposes. The final well casing depth shall be determined after completion of the downhole geophysical surveys. All contractors and subcontracts that wish to bid on, be listed on the bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. Each bidder shall be a licensed contractor pursuant to sections 7000 et seq. of the Business and Professions Code Class A - General Engineering Contractor or Class C34 - Pipeline Contractor California's license. Each bid shall be accompanied by cash, a certified or cashier's check, or Bid Bond secured from a surety company satisfactory to the DWP. The amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price, made payable to the City of Big Bear Lake DWP. The successful Bidder will be required to also furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price. DWP shall award the contract for the project to the lowest responsive, responsible Bidder as determined by the DWP from the base bid plus alternatives. The DWP reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process.

Post-Bid

Water / Sewer

$500,000.00

Public - City

Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
73
Bidding Soon
1,308
All Active Projects
619
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2022

March 16, 2022

img_map_placeholder

To Be Determined, Big Bear Lake, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.