BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 29, 2025 at 8:00 PM

Updated May 30, 2025

Site work and new construction of a mixed-use development in Crafton, Pennsylvania. Completed plans call for the construction of a pre-engineered storage facility; for site work for a pre-engineered storage facility; and water / sewer project.

PUBLIC WORKS FACILITY CONSTRUCTION PACKAGE Contract No. 1 - General Construction The project includes site development construction and interior fit-out of pre-engineered metal building previously erected for the Borough. Construction for this project includes, but is not limited to; wall and roof Insulation installation, overhead and man-door installation placement of an interior concrete slab-on-grade; interior partition walls, toilet room accessories, complete in place. Contract No. 2 - Electrical Construction This project involves electrical interior lighting construction for garage spaces and new interior office spaces; and coordination of electrical work with the Owner-contracted General Construction installer. Contract No. 3 - Plumbing Construction This project involves interior garage and office space plumbing construction; and coordination of interior plumbing with the Owner-contracted General Construction installer. Contract No. 4 - Mechanical Construction This project involves mechanical construction for overhead fans, HVAC and ventilations systems; and coordination of mechanical construction with the Owner-contracted General Construction installer. Question deadline - 9 May 2025 5pm Questions received less than seven days prior to the date for opening of Bid estimated / budgeted costs GC: $600k - $625k EC: $350k - $375k PC: $175k - $190k MC: $80k - $90k *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid-Results:- 1. Contract No. 1 – General Construction- M.A. Dunn Construction-$478,820.85 2. Contract No. 2 – Electrical Construction- Allegheny City Electric, Inc.-$261,000 3.Contract No. 3 – Plumbing Construction- First American Industries, Inc-$198,000 4. Contract No. 4 – Mechanical Construction- Air Systems Mechanical Contracting, Inc.-$116,000

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$1,053,820.00

Public - City

New Construction, Site Work

25

33

8

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
280
Active Projects
145
Bidding Soon
1,421
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2025

June 16, 2025

Project location map

Chartiers Ave, Crafton, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.